Laserfiche WebLink
<br />Key Staff Availability Key Staff Role <br />Percentage Available for the Project’s Duration based on Current and Future Commitments <br />Michael Sileno, PE Principal-in-Charge 50% Available <br />Henri Sinson, PE Project Manager / Structural / Construction 100% Available <br />Ronald Sanchez, PE Asst. Project Manager / Structural Engineer 70% Available <br />Jorge Soto, PE Structural Engineering 80% Available <br />George Patton, PE QA / QC Manager 50% Available <br />Steven Nappi, PE Constructability / Construction Services 50% Available <br />Daniel Tarantino, RA Architecture 70% Available <br /> <br />The H&H Sunrise office has the capacity to deliver $4.5 million of work per year. With two major FDOT bridge <br />replacement projects (Jupiter Federal over Loxahatchee River and North Bridge over ICWW) completing the <br />Biddability Phase in the second quarter of 2020, our workload will drop below our capacity. This workload drop <br />provides double the capacity needed to deliver the Bridge Park project. Additionally, Project Manager, Henri <br />Sinson, PE, is not currently managing any other major bridge projects and is 100% available to lead the Bridge <br />Park delivery. <br /> <br />E-16