My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2020-3042
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2020
>
Reso 2020-3042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 12:44:16 PM
Creation date
2/21/2020 3:16:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2020-3042
Date (mm/dd/yyyy)
02/20/2020
Description
Approve Agmt w/Tadeos Eng. – Design/Build Svcs - Pavilion Structure at Newport Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i s <br /> • <br /> RFP 19-11-02 Newport Pier Pavilion Construction <br /> BASE BID SCHEDULE <br /> ITEM QUANTFTY UNIT UNIT PRICE TOTALPRICE <br /> Mobilization 1 LS 15,000.00 15,000.00 <br /> Prepare shop drawings,permit application and secure permit 1 LS 25,000.00 25,000.00 <br /> Construct and Install 5'x 18'pavilions 10 EA 15,000.00 150,000.00 <br /> Construct and Install 10'x 20'pavilions 1 EA - • - <br /> Construct and Install 6'decorative benches 24 EA 3,000.00 72,000.00 <br /> General conditions 1 LS 20,000.00 20,000.00 <br /> Bond and Insurrance 1 LS 15,000.00 15,000.00 <br /> Permit Fees 1 LS 2,500.00 2,500.00 <br /> Overhead and profit 1 LS 80,000.00 80,000.00 <br /> Allowance for one(1)shade structure enclosure 1 LS 7,500.00 7,500.00 <br /> TOTAL BASE BID $387,000.00 <br /> Tadeos Engineering LLC <br /> Luis 0.De La Hoz,President <br /> Signature of Bidder <br />
The URL can be used to link to this page
Your browser does not support the video tag.