|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRMCassie Branum, AICP, LEED® AP Planning Principal 12 11
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Perkins and Will / Atlanta, Georgia
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Master of Science in Architecture, Urban Design, Georgia Institute of
<br />Technology; Master of City and Regional Planning, Georgia Institute
<br />of Technology, Master of Architecture, Georgia Institute of Technology;
<br />Bachelor of Science, Interior Design, Florida State University
<br />American Institute of Certified Planners (AICP)
<br />LEED® 2.0 Accredited Green Building Professional
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />n/a
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Historic Overtown Culture & Entertainment District, Miami, Florida 2019 Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm
<br />The study area includes a significant portion of the historic heart of Overtown’s business and nightlife district that is centered on 2nd
<br />Avenue, earlier known as Little Broadway or The Great Black Way. Overtown provides the opportunity to create a unique, walkable
<br />destination for the population that works, lives and visits those areas. It is also adjacent to the Metro Rail and the Miami Central Train
<br />Station, providing excellent access to local and regional public transit. Specific Role: Planning Principal; Scope: Master Planning, Urban
<br />Design; Size: 40 acres; Cost: N/A
<br />b.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)University of Florida, Innovation Square Master Plan, Gainesville,
<br />Florida 2012 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm
<br />Innovation Square is an urban redevelopment project that is transforming twelve underutilized blocks in Midtown Gainesville into a mixed-
<br />use urban research district that advances the national and global profile of the city’s largest employer: the University of
<br />Florida with its medical center, Shands Hospital at UF. Specific Role: Planning Principal; Scope: Master Planning, Urban Design, Landscape
<br />Architecture; Size: 60 acres; Cost: Confidential
<br />c.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Atlanta Beltline, Inc., Eastside Trail, Atlanta, Georgia 2011 2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm
<br />Built on a loop of reclaimed railroad tracks, the Atlanta BeltLine is a 22-mile multi-modal corridor consisting of transit, a linear greenway, and
<br />multiuse trails. This groundbreaking public infrastructure effort connects 45 historic neighborhoods around the city’s urban core, catalyz-
<br />ing economic development as it encircles the city. Specific Role: Planning Principal; Scope: Master Planning, Urban Design, Landscape
<br />Architecture; Size: 2.2 miles; Cost: $11 M
<br />d.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Florida International University Campus Master Plan, Miami, Florida Fill in Fill in
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm
<br />The growth plans for Miami’s 40,000-student public research university are accommodated in this update to the university-wide master
<br />plan. It focuses on three areas: the main Modesto Maidique Campus (344 acres / 392,120 square meter), the Engineering Center, and the
<br />Biscayne Bay Campus (40 acres / 161,875 square meter). Specific Role: Planning Principal; Scope: Master Planning, Urban Design; Size:
<br />7,000,000 sf; Cost: Confidential
<br />e.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Turner Field Stadium Neighborhoods Livable Centers Initiative Plan /
<br />Atlanta, Georgia 2016 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm
<br />The Turner Field LCI is a highly anticipated community plan with the potential to reshape the south side of Atlanta. The planning team
<br />conducted an extensive and unconventional public engagement process that reached over 1600 community residents and stakeholders and
<br />provided the critical feedback needed to build a bold plan. Specific Role: Planning Principal; Scope: Master Planning, Urban Design; Size:
<br />1.34 acres; Cost: N/A
<br />4646
|