12. NAME 13. ROLE IN THIS CONTRACT
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRMa. TOTAL
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />a.
<br />b.
<br />c.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />e.
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Georgio Tachiev, P.E.
<br />ECS Group FL, LLC, 1627 NE 17th Terrace, Fort Lauderdale, FL 33305
<br />PhD - Water Resources and Environmental Engineering,
<br />Vanderbilt University, TN
<br />MS - Chemical Engineering, Vanderbilt University, TN
<br />BS - Civil Engineering, VIAS, Sofia Bulgaria
<br />Publications: 40 peer review publications in Water Resources, Hydrology, Remediation, Computer Science, Organizations:
<br />EWRE chapter of ASCE, Miami, Training: Project Management, and Princeton Remediation Course
<br />Stormwater Master Plan Update of Miami Dade County
<br />Scope:Provided an update of the Stormwater Master Plan of Miami Dade County. Updated 8 storm water models with
<br />covering between 30 and 80 sq. miles. Developed input data, performed calibration and validation and developed design
<br />events for current and future sea level rise conditions. Cost: $600K, Specific Role: Principal engineer
<br />Scope: Develop a 2D model using MIKEFLOOD which couples MIKE11 with the 2D overland flow capabilities of
<br />MIKE21. Integrated the MIKE 11 model with the 2D model and conducted detailed evaluations of the flow in 8 treatment
<br />cells including 3 new cells: Model Size: 13,000 acres, Cost $450K, Specific Role: Lead MIKEFLOOD Model Developer
<br />Scope: Developed an integrated surface and subsurface model integrated with drainage water management operations
<br />of the Everglades National Park (ENP) using MIKE SHE and MIKE 11 simulation platforms and including operation
<br />schedule of control structures. Model Size 2625 square miles, Cost: $440K, Specific Role: Lead Model Developer
<br />Scope: Engineering services for Culvert Repairs in Stormwater Treatment Area STA-1E, West Palm Beach, dewatering
<br />plans earthen and sheetpile cofferdam design, analyze site lithology, hydrology, operation schedules of gates and
<br />pumps. Size: 7,000 acres, Cost: $135K, Specific Role: Principal Engineer
<br />Scope: Update and develop a new SAS code to provide analysis of flow and water quality parameters. Significant
<br />additions and modifications were made to the program to improve automation and allow execution in different computer
<br />environment. Size: 700,000 acres, 337 structures, 237 farms, Cost: $50K, Specific Role: Lead SAS Model Developer
<br />2D hydrodynamic model of Stormwater Treatment Area STA1-W, West
<br />Palm Beach.
<br />Integrated Surface and Subsurface Flow Model of the Everglades National
<br />Park (ENP)
<br />Engineering Services for Culvert Repair for Stormwater Treatment Area
<br />STA-1E, USACE
<br />Everglades Agricultural Area (EAA) Trends and Variability Analysis
<br />Professional Engineer, State of Florida, Environmental
<br />Engineering
<br />Environmental Engineer 27 <1
<br />2019
<br />2014
<br />2019
<br />2017
<br />2013
|