My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Radise International, LC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Radise International, LC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 4:01:48 PM
Creation date
8/19/2020 4:00:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) NO. 20-07-01 <br />39 <br />City of <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />3 <br />21. TITLE AND LOCATION (City and State) <br />Hood Road, East of Florida’s Turnpike to W. of <br />Central Boulevard and Hood Road & Central <br />Boulevard Improvements, Jupiter, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />January 2018 - July 2019 <br />CONSTRUCTION <br />(If applicable) <br /> <br />23. PROJECT OWNER’S INFORMATION <br />c. PROJECT OWNER <br />Palm Beach County Engineering & <br />Public Works <br />b. POINT OF CONTACT NAME Mr. Steve O’Neil <br />Palm Beach County Engineering & <br />Public Works <br />c. POINT OF CONTACT TELEPHONE <br /> NUMBER (561) 684 4180 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The project includes the widening Hood Road to four lanes between the turnpike and <br />Central Boulevard including infrastructure improvements and adding a new bridge to <br />add two lanes over Interstate 95 on the north side of Hood, Florida Turnpike to West <br />of Central Boulevard, Jupiter, Florida <br /> <br />The project started in January 2018 and was completed in July 2019. The <br />construction cost was approximately $14.1 million. <br /> <br />RADISE International provided the following services in the contract: <br />• Precast Yard Inspection (Precast Beams & Precast Piles) <br />• Pile Driving Inspection <br />• PDA <br />• EDC <br />• Drilled Shaft Inspections <br />• Earthwork sampling and testing <br />• Structural Concrete sampling and Testing <br />• Asphalt Plant Inspections <br /> <br /> RADISE performed field inspections, in situ compaction tests, sample collection and required Laboratory testing inclusive <br />of material classification, in situ moisture content, organic content, gradational analysis and Atterberg limits performed <br />on soil samples. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />RADISE International, LC <br />(2) FIRM LOCATION (City and State) <br />Riviera Beach, FL <br />(3) ROLE <br />Geotechnical Engineering, Inspection & <br />Lab Testing Services <br />b. <br /> <br /> <br /> <br /> <br /> <br />c. <br />d. <br />
The URL can be used to link to this page
Your browser does not support the video tag.