Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />DENIS A. DENIS, PSM, P.E. <br />13. ROLE IN THIS CONTRACT <br />Project Surveyor/Task Manager <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />12 <br />b. WITH CURRENT FIRM <br />4 <br />15. FIRM NAME AND LOCATION (City and State) <br />MASER CONSULTING, INC. – Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Business Administration, FIU., 2016 <br />BS, Civil Engineering, FIU, 2013 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Surveyor & Mapper (PSM), Florida <br />No. LS7017 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Professional Affiliations: Florida Surveying and Mapping Society (FSMS) – Member; American Congress on <br />Surveying & Mapping (ACSM) <br />19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />SR 922 / NE 125th Street <br />Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Provide Horizontal/Vertical Control and design survey files (DTM) for S.R 922/909/915 with various side streets in <br />North Miami. DTM limits to be 10 feet inside private property or building line whichever is less. Includes the following: <br />Recover & Verify exist. Horizontal Control for SR 922 & 909. Set New HC on SR 915, secondary control along side <br />streets and traverse as necessary to maintain NAD83/1990 coordinates; Benchrun through PN points on NAVD88; <br />Recon and locate occupation in support of establishing right of way and baseline alignments; Set minimum of 57 <br />targets to register mobile lidar; Locate obscure areas and utilities at ground and overhead not visible by MLA <br />(excludes underground); Sketch mast arm clearances; Perform 25 check cross sections; Locate 130 drainage <br />structures; Provide Rim, Invert, Pipe size & direction; mobile lidar planning, coordination & mobilization; acquire scan; <br />process & clean scan and transformation; 2/3D mapping. Role: Project Surveyor. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />SR 976 (Bird Road) from SW 117th Avenue to SW 102nd Avenue <br />–Design Survey <br />Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Design Survey to include alignment, right-of-way file, DTM and topo. Field work included GPS and traverse <br />primary and secondary points, set benchmarks for benchrun, recon and locate occupation for baseline and side <br />streets, and right-of-way lines, topo and DTM with mobile lidar (88 +/- targets located), topo obscure areas, and <br />perform check x-sections. Office work included calculating baseline based on occupation and historical data, <br />calculating r/w lines, preparing topo, drainage, utilities, and DTM files, and preparing PNC sheets. Role: Project <br />Surveyor. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />SR 972 (Coral Way) Design Survey at I-95 (250686-2), FDOT <br />District 6 <br />Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Design Survey to include alignment, right-of-way file, DTM and topo. Field work included GPS and traverse primary <br />and secondary points, set benchmarks for benchrun, recon and locate occupation for baseline and side streets, and <br />right-of-way lines, topo and DTM with lidar scanning, check x-sections, and obtain invert elevations of drainage <br />structures. Office work included calculating baseline based on occupation and historical data, calculating r/w lines, <br />preparing topo, drainage, utilities, and DTM files, and preparing PNC sheets. Role: Project Surveyor. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />SR 968 (W. Flagler Street) from 23rd Avenue to 17th Avenue – <br />Design Survey <br />Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Review horizontal project control as it pertains to baseline alignment and its relationship to historical baseline; review <br />existing right of way lines per found monumentation and existing Right of Way Maps and search public records and <br />recorded documents where discrepancies are found; and review Maintenance Map prepared based on limited <br />topographic survey and found monumentation. Role: Surveyor Consultant to FDOT / Reviewer. <br />Section E, Page 24