|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />MICHAEL CARDO, PSM
<br />13. ROLE IN THIS CONTRACT
<br />Project Surveyor / Task Manager
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />15
<br />b. WITH CURRENT FIRM
<br />6
<br />15. FIRM NAME AND LOCATION (City and State)
<br />MASER CONSULTING, INC. – Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />BS, Geomatics, University of Florida, 2006
<br />AAS, Computer Engineering, Miami Dade College,
<br />2004
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Surveyor & Mapper (PSM), Florida No. LS7156
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Professional Affiliations: Florida Surveying and Mapping Society (FSMS); American Congress of Surveying and
<br />Mapping (ACSM)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />Block 40 Apartments, Downtown Miami
<br />Miami County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Surveyor in charge of a multi-level residential tower. Coordination, scheduling and planning in collecting field
<br />occupation evidence to solve the property boundary and determine fitment of construction plans within limit of the
<br />property. Pile, footer, power, storm, water and sewer utility layout and as-built. Verifying grid line control during
<br />progress of construction. Establish monitoring pins at base of building to determine settlement by end of construction.
<br />Water and sewer as-built plans for county review and approval. Final as-built survey. Role: Project Surveyor.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />1000 Museum, Downtown Miami
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Surveyor in charge of coordination, scheduling and execution of all survey services for the 62-story tower. Established
<br />site control and performed boundary solution, coordinated fitment of proposed building and amenities within limits.
<br />Laid out piles and all foundation members, established gridline control at ground level and verified all the way to top
<br />floor at finished construction, performed settlement monitoring throughout construction, generated final utility as-
<br />builts and final as-built survey. Role: Project Surveyor.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />Paraiso Bay
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Surveying service included but not limited to boundary analysis, verify existing conditions, site coordination sheet,
<br />settlement & monitoring, construction as-builts, construction layout, water and sanitary easement, and elevation
<br />certificate. Professional agreement current total is $117,546.00 with an area of 221,357 sq ft. Role: Project Surveyor.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />One Paraiso
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Design Survey to include alignment, right-of-way file, DTM and topo. Field work included GPS and traverse primary
<br />points, set benchmarks for benchrun, recon and locate occupation for baseline and side streets, and right-of-way
<br />lines, topo and DTM, and x-sections. Office work included calculating baseline based on occupation and historical
<br />data, calculating r/w lines, preparing topo, drainage, utilities, and DTM files, and preparing PNC sheets. Role: Project
<br />Surveyor.
<br />e.
<br />(1)TITLE AND LOCATION (City and State)
<br />Norris Cut
<br />Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Surveying service for Sanitary tunnel included but not limited to Horizontal and vertical control, topographic survey,
<br />settlement & monitoring, construction as-builts, and construction layout. Professional agreement current total is
<br />$193,732.50. Role: Project Surveyor.
<br />Section E, Page 26
|