E-12Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Rudy Ortiz, PE, CGC CEO; Principal-in-Charge A. TOTAL B. WITH CURRENT FIRM
<br />30+19
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. Pembroke Pines & Miami, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />BS Civil Engineering, The University of New York, 1983 FL Professional Engineer #52515, NY #071607;
<br />FL Certified General Contractor #CGC1512966
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Certifications & Training: Design Build Project Delivery System, Basic Blueprint & Related Math, Basic Winds Load ASCE 7-05,
<br />FL Workers Compensation Law, Wind Mitigation Methodology; Member, American Water Works Association; Member, Florida
<br />Engineering Society; Member, National Society of Professional Engineers
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Palm Beach County Water Utilities Department Looping Project,
<br />Palm Beach County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />QA/QC for the rehabilitation of 16,000 LF of water main pipelines of varying sizes from 4” to 12” including DIP, PVC and
<br />HDPE at 19 locations across Palm Beach County. Installation of the new segments of waterline and new interconnections
<br />improved system capacity and hydraulic efficiencies, eliminated dead-ends, and reduced water retention time, resulting in
<br />improved water quality. Directional Drilling was designed for major intersections and tree lined corridors.
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />West Ave. North & South Neighborhood & Resiliency Improvements D/B
<br />Projects, Miami Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Principal-in-Charge & QA/QC for the $72M D/B projects to develop a stormwater model, water/sewer/utility and roadway
<br />design, permitting and infrastructure construction of 1.2 miles of roadway to address sea level rise in the West Avenue
<br />Basin. The project requires raising the roadway approximately 30 inches while providing a 10-year level of service with no
<br />structure flooding. The contributing basin is 600 acres and all 12 utilities along the roadway will be affected. Upsizing and
<br />design of curb inlets and yard inlets and upsizing/modifications of two pumps stations. Project includes 16,000 LF of water
<br />main, 7,050 LF of sanitary gravity sewer, 12,800 LF of storm sewer and a 120,000 GPM stormwater pump station and outfall.
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />NW 12th Avenue Force Main Replacement, North Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Principal-in-Charge & QA/QC responsible for the design, permitting, and construction of 10,500 LF of 10- and 12-inch
<br />replacement force main in NW 12th Avenue extending from NW 95th Street to NW 125th Street. The project replaced aging,
<br />asbestos-cement and cast iron force mains with corrosion resistant PVC pipe. A number of private force main connections
<br />required relocation and reconnection to the new force main, as well as planning for uninterrupted service during construction.
<br />D.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />MDWASD Pump Station Improvement Program (PSIP),
<br />Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Principal-in-Charge & QA/QC leading the project team in providing engineering analysis and design services for the
<br />upgrade of various sanitary sewer pump stations ranging in size from 300 GPM to 900 GPM. Pump Stations and associated
<br />force mains designed include: PS 609, PS 449, PS 147, PS 331, PS 440, PS 081, and PS 592.
<br />E.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Ft. Lauderdale Waterworks 2011 Program, Ft. Lauderdale, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2012 2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Principal-in-Charge & QA/QC for $550M program, providing full time Construction Engineering and Inspection Services
<br />infrastructure improvement projects being carried out by construction companies at various locations.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|