Laserfiche WebLink
E-12Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Rudy Ortiz, PE, CGC CEO; Principal-in-Charge A. TOTAL B. WITH CURRENT FIRM <br />30+19 <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. Pembroke Pines & Miami, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline) <br />BS Civil Engineering, The University of New York, 1983 FL Professional Engineer #52515, NY #071607; <br />FL Certified General Contractor #CGC1512966 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certifications & Training: Design Build Project Delivery System, Basic Blueprint & Related Math, Basic Winds Load ASCE 7-05, <br />FL Workers Compensation Law, Wind Mitigation Methodology; Member, American Water Works Association; Member, Florida <br />Engineering Society; Member, National Society of Professional Engineers <br />19. RELEVANT PROJECTS <br />A. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Palm Beach County Water Utilities Department Looping Project, <br />Palm Beach County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />QA/QC for the rehabilitation of 16,000 LF of water main pipelines of varying sizes from 4” to 12” including DIP, PVC and <br />HDPE at 19 locations across Palm Beach County. Installation of the new segments of waterline and new interconnections <br />improved system capacity and hydraulic efficiencies, eliminated dead-ends, and reduced water retention time, resulting in <br />improved water quality. Directional Drilling was designed for major intersections and tree lined corridors. <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />West Ave. North & South Neighborhood & Resiliency Improvements D/B <br />Projects, Miami Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Principal-in-Charge & QA/QC for the $72M D/B projects to develop a stormwater model, water/sewer/utility and roadway <br />design, permitting and infrastructure construction of 1.2 miles of roadway to address sea level rise in the West Avenue <br />Basin. The project requires raising the roadway approximately 30 inches while providing a 10-year level of service with no <br />structure flooding. The contributing basin is 600 acres and all 12 utilities along the roadway will be affected. Upsizing and <br />design of curb inlets and yard inlets and upsizing/modifications of two pumps stations. Project includes 16,000 LF of water <br />main, 7,050 LF of sanitary gravity sewer, 12,800 LF of storm sewer and a 120,000 GPM stormwater pump station and outfall. <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />NW 12th Avenue Force Main Replacement, North Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2016 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Principal-in-Charge & QA/QC responsible for the design, permitting, and construction of 10,500 LF of 10- and 12-inch <br />replacement force main in NW 12th Avenue extending from NW 95th Street to NW 125th Street. The project replaced aging, <br />asbestos-cement and cast iron force mains with corrosion resistant PVC pipe. A number of private force main connections <br />required relocation and reconnection to the new force main, as well as planning for uninterrupted service during construction. <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD Pump Station Improvement Program (PSIP), <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Principal-in-Charge & QA/QC leading the project team in providing engineering analysis and design services for the <br />upgrade of various sanitary sewer pump stations ranging in size from 300 GPM to 900 GPM. Pump Stations and associated <br />force mains designed include: PS 609, PS 449, PS 147, PS 331, PS 440, PS 081, and PS 592. <br />E. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Ft. Lauderdale Waterworks 2011 Program, Ft. Lauderdale, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Principal-in-Charge & QA/QC for $550M program, providing full time Construction Engineering and Inspection Services <br />infrastructure improvement projects being carried out by construction companies at various locations. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2