<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />The West Avenue North Corridor Project included:
<br />Water Distribution and Transmission System: The North project includes
<br />replacement of the existing water main distribution and transmission system,
<br />to include 1,150 LF of 6-inch fire service lines, 7,350 LF of 12-inch distribution
<br />main, and 3,000 LF of 20-inch transmission main. New service connections,
<br />water meters, fire hydrants, and irrigation lines will be installed. The new water
<br />distribution/transmission system will be installed along West Avenue between
<br />14th Street and Lincoln Road, along Bay Road between Flamingo Way and the
<br />Collins Canal, and along 14th Terrace to Lincoln Road between West Avenue and
<br />Alton Road. The existing water mains are being decommissioned.
<br />Sanitary Sewer Collection System: The North project includes rehabilitation
<br />and/or replacement-in-kind of the existing sanitary sewer collection system and
<br />adjustments to slopes and manholes to improve the existing system. The design
<br />includes the replacement of 5,400 LF of pipe of varying sizes (12-inch, 15-inch,
<br />16-inch, and 18-inch) and 32 manholes.
<br />Stormwater Drainage System Improvements and Rehabilitation: The North project includes replacement and upsizing of the
<br />existing stormwater drainage system. The following will be installed as part of the project: 3,600 LF of 24-inch RCP drainage,
<br />2,100 LF of 48-inch RCP drainage, 800 LF of 60-inch RCP drainage, 2,300 LF of 72-inch RCP drainage, 400 LF of 84-inch
<br />RCP drainage, and 300 LF of 96-inch RCP drainage, with equivalent sized box culvert materials considered as an alternate.
<br />Additionally, a new 120,000 GPM stormwater pump station, including water quality treatment units and a specialized dissipator
<br />discharge structure, will be installed on the west end of Lincoln Road.
<br />The West Avenue SOUTH Corridor Project included:
<br />Water Distribution and Transmission System: The South project includes
<br />replacement of the existing water main distribution and transmission system. The
<br />following will be installed as part of the project: 980 LF of 6-inch fire service
<br />lines, 3,900 LF of 12-inch distribution main, and 2,400 LF of 20-inch transmission
<br />main. New service connections, water meters, fire hydrants, and irrigation lines
<br />will be installed. The new water distribution/transmission system will be installed
<br />along West Avenue, between 8th and 14th Streets, and along 8th Street to 14th
<br />Street between West Avenue and Alton Road. The existing water mains are being
<br />decommissioned.
<br />Sanitary Sewer Collection System: The South project includes rehabilitation and/or replacement-in-kind of the existing sanitary
<br />sewer collection system and adjustments to slopes and manholes to improve the existing system. The design includes the
<br />replacement of 3,350 LF of pipe of varying sizes (12-inch, 15-inch, 16-inch, and 18-inch) and 30 maintenance access structures.
<br />Stormwater Drainage System Improvements and Rehabilitation: The South project includes replacement and upsizing of the
<br />existing stormwater drainage system and includes 2,055 LF of 24-inch RCP drainage, 30 LF of 30-inch RCP drainage, 870 LF
<br />of 48-inch RCP drainage, and 1,700 LF of 60-inch RCP drainage, with equivalent sized box culvert materials considered as an
<br />alternate.
<br />25. Firms from section involved with this project
<br />A.
<br />(1) FIRM NAME (2) FIRM LOCATION (City & State) (3) ROLE
<br />CES Consultants, Inc.Miami & Pembroke Pines, FL Civil Engineering, Roadway & Utilities Design,
<br />Hydraulic Modeling, Construction Services
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3
|