E-56Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br /> »Design of Pump Station No. 336: Analyzed and designed
<br />the upgrades to PS 336. The station analysis included
<br />reviewing SCADA data, hydraulic information provided
<br />by WASD, as-built information, and site inspections. The
<br />data indicated that this pump station had undersized
<br />pumps, wet well, discharge piping and valve vault. The
<br />design included a new 8-foot diameter wet well, a new
<br />valve vault, new 20 HP pumps, new 6-inch discharge
<br />piping, a new electrical panel, 50 LF of 6-inch force
<br />main, and a complete civil site redesign to optimize use
<br />of the limited space.
<br /> »Design of Pump Station No. 1026: Analyzed and
<br />designed the upgrades to PS 1026. This design is
<br />a completely new pump station located within the
<br />public right of way in an easement next to residential
<br />properties. The station analysis included reviewing
<br />SCADA data, hydraulic information provided by WASD,
<br />as-built information, and site inspections. The design
<br />included refurbish a 6-foot diameter wet well, a new
<br />valve vault, new 30 HP pumps, new 6-inch discharge
<br />piping, a new electrical panel, and complete civil site
<br />design to minimize the impact to the public right of way.
<br /> »Design of Pump Station No. 1065: Analyzed and
<br />designed the upgrades to PS 1065. This design is a
<br />completely new pump station located within the public
<br />right of way in an easement next to a commercial
<br />properties (warehouses). The station analysis included
<br />reviewing SCADA data, hydraulic information provided
<br />by WASD, as-built information, and site inspections.
<br />The design included refurbishing a 6-foot diameter wet
<br />well, a new valve vault, new 15 HP pumps, new 6-inch
<br />discharge piping, a new electrical panel, and complete
<br />civil site design to minimize the impact to the public
<br />right of way.
<br /> »Design of Pump Station No. 0596: Analyzed and
<br />designed the upgrades to PS 1065. This design is
<br />a completely new pump station located within the
<br />public right of way in an easement next to residential
<br />properties. The station analysis included reviewing
<br />SCADA data, hydraulic information provided by WASD,
<br />as-built information, and site inspections. The design
<br />included refurbish a 6-foot diameter wet well, a new
<br />valve vault, new 20 HP pumps, new 6-inch discharge
<br />piping, a new electrical panel, and complete civil site
<br />design to minimize the impact to the public right of way.
<br /> »Design of Pump Station No. 0394: Analyzed and
<br />designed the demolition of PS 0394. This design was
<br />to remove a pump station located within an easement
<br />inside a private school. A new pump station had been
<br />designed and constructed within the right of way to
<br />facilitate maintenance. Once the new pump station was
<br />certified and operational, CES developed construction
<br />plans for the complete demolition of the original station.
<br /> »Design of Pump Station No. 491: Analyzed and
<br />designed the upgrades to PS 491. The station analysis
<br />included reviewing SCADA data, hydraulic information
<br />provided by WASD, as-built information, and site
<br />inspections. With this data, it was concluded that this
<br />station required a full conversion from a wet well / dry
<br />well system. The existing wet well was converted into
<br />a receiving manhole, the existing dry well area was
<br />converted into a wet well, and a new valve vault was
<br />designed. Finally, the pump station was upgraded from
<br />20-HP pumps to a more efficient 25-HP submersible
<br />pumps.
<br />25. Firms from section involved with this project
<br />A.
<br />(1) FIRM NAME (2) FIRM LOCATION (City & State) (3) ROLE
<br />CES Consultants, Inc.Miami, Pembroke Pines, &
<br />Tampa, FL
<br />Civil Engineering, Design, Inspection/Evaluation
<br />& Analysis, Construction Services, Mechanical,
<br />Electrical & Structural Engineering
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 3
|