|
QUALIFICATION INFO & ASSIGNED PERSONNELE.
<br />CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE)
<br />City of Sunny Isles Beach RFQ 20-07-01| PAGE 31
<br />12. NAME 13. ROLE IN THIS CONTRACT
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRMa. TOTAL
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />a.
<br />b.
<br />c.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />e.
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Check if project performed with current firm
<br />Check if project performed with current firm
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />19. RELEVANT PROJECTS
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Art Kamm PE, CxA, LEED AP Managing Principal-in-Charge 31 20
<br />R.A. Kamm & Associates, Inc. d/b/a Kamm Consulting, Inc. Deerfield Beach, Florida
<br />Mechanical/Electrical Engineering – BSME, 1983
<br />University of Toledo
<br />20182017
<br />X
<br />City of Sunrise Welleby Park Improvements – Community Center Sunrise, Florida
<br />Demo existing youth fields for new program, five (5) new covered basketball courts, new 15,000 sf multi-purpose building (including gymnasium), refinish existing parking
<br />lot Refurbish fields (drainage/re-sod) New concession/scorers building, Refinish & re-quip existing (3) tennis courts and existing (2) racket courts and renovate adjacent
<br />restrooms, Renovate existing playground Renovate existing meeting hall and restrooms, renovate adjacent storage building, expand south parking towards the east and
<br />tie into existing, upgrade all sports lighting. Refurbish/renovate existing scorer’s tower at baseball fields, refurbish/renovate existing baseball fields and restroom building,
<br />security Improvements including cameras, Code Blue and lighting. Role: Managing Principal.
<br />20182017
<br />X
<br />Sunset Strip 9 – Sunrise “City Park” Park Renovation Sunrise, Florida
<br />Scope included Pull Out – Renovate/Remodel interior spaces (new work), new Restrooms, Splash Pad, Parking Area, two covered bas-
<br />ketball courts, full size multi-purpose field with walking paths, theatrical stage with lighting and sound systems, refinish and re-equip two
<br />(2) existing tennis courts, security Improvements (Cameras, Code Blue and Lighting) Role: Managing Principal.
<br />20132013
<br />X
<br />West Pines Soccer Park & Community Building Pembroke Pines, Florida
<br />A freestanding 1,700 square foot meeting room/restroom building and two additional lighted practice soccer fields at the existing West
<br />Pines Soccer Park and Nature Preserve. The project includes Bermuda sod and 80/20 soil mix, lighting, electrical, drainage, de-muck &
<br />fill, laser grading, irrigation retrofit, bleachers, benches, shade structures, and sidewalks. Role: Managing Principal.
<br />Florida Licensed Professional Engineer #44004
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />Ongoing2019
<br />X
<br />City of Sunrise - Sunrise Athletic Complex Sunrise, Florida
<br />Addition and renovation of a 1,156,848 square foot park. The complex will have a new athletic building, new playground, and new
<br />plaza for food vendors or food markets. In addition, three new multi-sport fields will be added along with a concession stand and sports
<br />commentator tower. Est. cost: $11.75 Million. Role: Managing Principal.
<br />2 0112 011
<br />X
<br />Pembroke Shores YMCA Addition & Renovation Pembroke Pines, Florida
<br />A 17,000 square foot addition and phased redevelopment of the existing Pembroke Shores Gymnasium Facility and construction of a
<br />200 vehicle parking lot. Remodeling work was also completed in portions of the existing facility. The existing facility was 100% opera-
<br />tional during construction. Cost: $4,200,000. Role: Managing Principal.
<br />10. RELEVANT PROJECTS
|