|
ENGINEERING YOUR SUCCESS 33
<br />SECTION EQUALIFICATION INFORMATION & ASSIGNED PERSONNEL
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Carlos Paris
<br />Senior Project Engineer - Mechanical
<br />13. ROLE IN THIS CONTRACT
<br />Senior Project Engineer - Mechanical
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />15
<br />b. WITH CURRENT FIRM
<br />15
<br />15. FIRM NAME AND LOCATION (CITY AND STATE)
<br />OCI Associates, Inc., West Palm Beach, Florida
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science, Mechanical Engineering, Universidad Metropolitana
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />N/A
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
<br />As a Senior Project Engineer - Mechanical Carlos offers over 14 years of experience in the design of HVAC systems. Quite diverse in his
<br />abilities he is extremely knowledgeable in the design of correctional, federal, municipal, medical and educational facilities, as well as
<br />manufacturing plants, laboratories, office buildings, residential high-rise buildings and single-family homes. He is responsible for the HVAC
<br />design and construction administration, and his extensive hands-on management style has helped grow our client base and establish Prime
<br />MEP Continuing Service Contracts with many of OCI’s clients.
<br />19. RELEVANT PROJECTS
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Dade College Prime MEP Continuing Services Contract
<br />Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />5+ Year Relationship with Miami Dade College. Providing MEP services for the College under our Prime contract on projects including
<br />Wolfson Campus Building 1000 Cooling Tower Replacement, and several larger projects as a subconsultant.
<br />| Senior Project Engineer - Mechanical
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Florida Atlantic University Prime MEP Continuing Services Contract
<br />Boca Raton, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />17+ Year Relationship with Florida Atlantic University. Providing MEP services for the University under our Prime contract on projects
<br />including the College of Medicine 2nd Floor Distilled Water System, GY-38 Scoreboard Upgrade, Boca Campus 13kV Infrastructure
<br />Electrical Upgrades, MC-19 Transformer Replacement, and more. | Senior Project Engineer - Mechanical
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broward College Prime MEP Continuing Services Contract
<br />Fort Lauderdale, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />8+ Year Relationship with Broward College. Providing MEP services for the College under our Prime contract on project including IT
<br />Room Relocation, Cypress Creek 3rd Floor IRPE, Bailey Hall Building 4 HVAC Evaluation, and more. | Senior Project Engineer - Mechanical
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Barry University MEP Continuing Services Contract Subconsultant
<br />Fort Myers, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />6+ Year Relationship with Barry University. Providing MEP services for the University under our subconsultant contract with Harvard
<br />Jolly Architecture on projects including Thompson Hall Elevator Addition, Weigand Hall Nursing Renovation, Adrian Hall Minor
<br />Administration Remodel, and more. | Senior Project Engineer - Mechanical
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lee County Prime MEP Continuing Services Contract
<br />Lee County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
<br />OCI has a 5+ Year Relationship with Lee County under a Prime continuing services contract, and as a subconsultant for architectural
<br />firms that perform work for the County. | Senior Project Engineer - Mechanical
|