My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
OCI Consulting Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
OCI Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:26:50 AM
Creation date
8/21/2020 10:26:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING YOUR SUCCESS 56 <br />SECTION FFIRM REFERENCES & SIMILAR WORK COMPLETED <br />Prime MEP Continuing Services Contract <br />MIAMI DADE COLLEGE <br />OCI has a 5+ Year relationship with Miami Dade College under a Prime MEP Continuing Services Contract. <br />ROLE Prime/MEP/FP <br />COST Under $2 Million <br />COMPLETED Ongoing <br />REFERENCE <br />Miami Dade College <br />11011 S.W. 104th Street <br />Miami, FL 33176 <br />Saeed Fatemian, District Director of Plant & Facilities Maintenance <br />Phone: 305-237-0514 <br />Fax: N/A <br />mfatemia@mdc.edu <br />KEY TEAM MEMBERS <br /> · Amir Kazeminia, PE | Principal in Charge <br /> · Sudharma Wijegunawardana, PE, LEED AP, LC | Electrical Engineer of Record <br /> · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record <br /> · Keith Liatsos, PE | Senior Electrical Engineer QA/QC <br /> · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection <br /> · Robert Coello | Senior Fire Protection Designer <br /> · Carlos Paris | Senior Project Engineer - Mechanical <br /> · Colin Cassidy, EI | Project Engineer - Electrical <br /> · Johanna Paris | Mechanical Designer <br />Below is a list of Continuing Service and subconsultant projects: <br /> · Kendall Campus AHU Replacement Building 2000 <br /> · Kendall Campus Pre-School Building <br /> · Wolfson Campus Building 3000 CEP and Building 6000 HVAC Upgrades <br /> · Wolfson Campus Building 1000 Cooling Tower Replacement <br />Wolfson Campus <br />Kendall Campus
The URL can be used to link to this page
Your browser does not support the video tag.