My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 (1/2004) PAGE 2 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />d <br />(1) TITLE AND LOCATION (City and State) <br />Water Control Plans / Plans of Reclamation <br />(Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br /> N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Prepared water control plans relating to Chapter 298, Florida Statutes. This includes improvements <br />related to roadways, parks, paving, grading, drainage, water and wastewater systems. Cost estimates, <br />financial alternatives, maintenance obligations, and cost/benefit analysis were also addressed. Expert <br />testimony experience and benefit analysis for approving plans and funding included (1) Indian Trail <br />Improvement District Phase II Road Paving Plan - 28 miles, $15.7 million, (2) Indian Trail Improvement <br />District Unit of Development No. 17 - Paving, grading, drainage, water and wastewater, $13.8 million, (3) <br />Indian Trail Improvement District Unit RC Recreation - 7 parks, $1.8 million, and (4) Design of a Pollution <br />Load Reduction system for the Town of Ocean Ridge which received $900,000 in Lake Worth Lagoon <br />Grants and $350,000 in a Federal 319 Grant. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />e <br />(1) TITLE AND LOCATION (City and State) <br />Environmental Engineering <br />(Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br /> N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Design, calculations, studies, reports, plans, permitting and construction observation services for projects <br />located within Monroe, Broward and Palm Beach Counties. Projec ts included environmentally sensitive <br />areas, dredge and fill, mitigation, revitalization and wetland creation, stormwater management, and <br />flood control. Projects/plans included: (1) Key West Fairways, a 388 Unit of Development within Key West <br />Golf Course, Stock Island, (2) Triploid Grass Carp project for Indian Trail Improvement District, (3) <br />Evaluation of Phosphorus levels in the M -1 Basin of Indian Trial Improvement District, and (4) Speaker of <br />Flo-Sun's "Truth Squad" regarding the 1947 Central and South Florida Flood Control Project and Sugar <br />Industries proposed one cent sales tax. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />f <br />(1) TITLE AND LOCATION (City and State) <br />Village of Palm Springs- Village Engineer <br />(Palm Springs, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-going <br />CONSTRUCTION (If applicable) <br /> N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Serves as Client Services Manager of Engenuity Group to the Village of Palm Springs and ac ts as a civil <br />engineering consultant to Village Staff. Lisa frequently reviews engineering plans and plats submitted by <br />private applicants to the Village for approval to build or alter various structures. Lisa also directs <br />Engenuity Group Staff in the desi gn of various Village projects. Current projects include sewer system <br />design in Griffin Square and on the Babbsco property as well as preliminary design of Foxtail Palms Park. <br /> <br /> <br />29
The URL can be used to link to this page
Your browser does not support the video tag.