My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Engenuity Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Engenuity Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:30:07 AM
Creation date
8/21/2020 10:28:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> STANDARD FORM 330 (1/2004) PAGE 2 <br />Ms. Malin is the Project Manager for the survey department working alongside Engenuity Group’s <br />engineering department, Robling Architecture & Construction, and Palm Beach County Library <br />Department Staff to design and construct a replacement sanitary sewer line that has been <br />compromised. She is the project manager involved with the preparation of a topographic survey of the <br />area located outside of the Library’s northern building on Civic Center Way where the existing line runs <br />extending to the building and through the parking area. Data collected will include inverts at manholes <br />and cleanouts and all other above ground improvements. She is also the project manager for the <br />contractor that will remove and install the new sewer line and will oversee the production of record <br />drawings after construction completion. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />STA 2 Cell 4 Expansion and North and South Build <br />Out Area <br />(, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Establish Horizontal and Vertical Control <br /> Topographic Survey <br />e . <br />(1) TITLE AND LOCATION (City and State) <br />City of Palm Beach Gardens <br />(Palm Beach Gardens, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Topographic Survey of Allamanda Blvd <br /> Topographic Survey of Shady Lakes Drive <br /> Topographic and Tree Survey for Campus Drive <br />f . <br />(1) TITLE AND LOCATION (City and State) <br />Palm Beach County <br />(Palm Beach County, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Topographic Survey for design of Water Utilities Department Watermain Improvements <br /> Haverhill Road from Caribbean Blvd to Beeline Highway Project Surveyor <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />City of Margate- Forcemain Addition <br />(Margate, Florida) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Topographic Route Survey of Southgate Blvd & Rock Island Road <br /> <br />31
The URL can be used to link to this page
Your browser does not support the video tag.