|
<br />
<br /> STANDARD FORM 330 (1/2004) PAGE 2
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Jude Jean Pierre
<br />13. ROLE IN THIS CONTRACT
<br />Project Surveyor
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 3
<br />b. WITH CURRENT FIRM
<br /> <1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Engenuity Group, Inc. (Deerfield Beach, Florida)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science, Geomatics - Utah
<br />Valley University, 2017
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />South Tech High School Academy
<br />(Boynton Beach, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> 2020
<br />CONS TRUCTION (If applicable)
<br /> Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Pierre assisted with a Boundary, Topographic & Tree Survey to determine the
<br />location, size, depth and direction of flow of sanitary sewers, and storm drains.
<br />Additionally, he provided the location of catch basins and manholes, and inverts of
<br />pipe at each location.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />49th Street & Pinewood Ave. Topo Survey
<br />(West Palm Beach, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONS TRUCTION (If applicable)
<br /> Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Pierre assisted with a Topographic Survey at the intersection of 49th Street and
<br />Pinewood Ave. This survey included spot elevation, and an as-built of the drainage
<br />structure.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lakewood Gardens Parks
<br />(Palm Springs, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONS TRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Mr. Pierre provided a Boundary & Topographic Survey for Lakewood Gardens Parks. This
<br />survey provided the Legal Description, plot location, structures, and fences, as well as
<br />displayed easement and right-of-way areas.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Southern Blvd. Topo Survey
<br />(Wellington, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> 2020
<br />CONS TRUCTION (If applicable)
<br /> Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />16” Forcemain Addition from Tuttle Royale to Forest Hill Blvd – Mr. Pierre provided a
<br />Topographic Survey, which included the legal Description, plot location, and structures
<br />(size, depth, and fences). Additionally, he provided the location, size, depth and
<br />direction of flow of sanitary sewers, storm drains and culverts serving, or on, the
<br />property; this included the location of catch basins and manholes, and inverts of pipe
<br />at each. Lastly, Tree size, easement, and right-of-way was shown.
<br />
<br />33
|