Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEYPERSONNEL (From Section E, Block 12) <br />27. ROLE IN THISCONTRACT (From Section E, Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F(Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />Adam C. Swaney, P.E. Prime Project <br />manager X X X X X X <br />Richard Brown, E.I.Project manager X X X X X X <br />Tara Bamber, P.E. Project manager X X X X X X <br />Liliana M. Vanegas, E.I.Project engineer X X X X X X <br />Kimberli Kile, E.I. Project engineer X X X X X X <br />Kender Louisius Project engineer X X X X X X <br />Dale Simons Autocad drafter X X X X X X <br />Keith B. Jackson, P.E. Construction <br />administration / <br />CEI <br />X X X X X X <br />Lisa A. Tropepe, P.E. Quality assurance <br />/ quality control X X X X X X <br />Jennifer Malin, P.S.M. Prime project <br />manager X X X X X X X X X <br />Todd Bates, P.S.M. Project surveyor X X X X X X X X X <br />Jude Jean Pierre Project surveyor X X X X X X X X X <br />John G. Rice, P.S.M.Project surveyor X X X X X X X X X <br />Joseph Williams Project surveyor X X X X X X X X X <br />Gary M. Rayman, P.S.M. Project surveyor X X X X X X X X X <br />Adam Beck Autocad drafting X X X X X X X X X <br />Robert Bednar Autocad drafting X X X X X X X X X <br />Mariah Anderson Autocad drafting X X X X X X X X X <br />Travis Morrell Field crew mngr. X X X X X X X X X <br />Crew Chiefs Crew members X X X X X X X X X <br />C. Andre Rayman, P.S.M.Quality assurance <br />/ quality control X X X X X X X X X <br />58 <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br /> X