Laserfiche WebLink
Sunny Isles Beach <br /> Foxtail Palms Park Design- $54,000 <br /> 2017 Lift Stations Rehabilitation– $90,100 <br /> Lakewood Road Sidewalks Design- $49,300 <br /> CRA Creation Legal Descriptions- $5,200 <br /> Village Hall Park & Fitness Pavilion- $30,500 <br /> 2018 Lift Stations Rehabilitation- $117,000 <br /> Cypress Lane Stormwater & Watermain Improvements- $37,000 <br /> Royal Palm Park Fishing Pier Design- $18,000 <br /> Frost Lake Outfall Improvements- $23,750 <br /> Lakewood Road Stormwater Improvements- $20,800 <br /> Lakewood Gardens Park Topographic Survey- $5,800 <br />Village of Wellington <br />Engenuity Group has been the Village Engineer for Wellington since 1999 and has worked <br />on hundreds of different design and review projects in our tenure. Total Fees amount to <br />approximately $2.5 Million over the past 21 years. <br />Florida Atlantic University <br /> Boca Campus Parking Lots 16 & 18- $22,515 <br /> P-7368 Connection to Tech Runway- $3,500 <br /> Boca Campus-wide Boundary Survey- $18,250 <br /> Campus-wide Pavement Classification Study- $12,400 <br /> Davie Campus Stormwater Evaluation Report- $23,000 <br /> Honors Campus Drainage Study- $8,900 <br />Town of Jupiter Island <br /> North Beach Road Survey, Drainage & Roadway Rehabilitation- $113,900 <br /> 2018-2020 Annual Bondholder Facilities Reports- $54,000 <br /> Risk & Resiliency Assessment & Report– $51,850 <br />City of Delray Beach <br /> George Bush Blvd. Alleyway Staking- $1,800 <br /> Lake Ida Park Sketch & Descriptions- $2,900 <br /> Construction Standard Details & Approved Materials List Updates- $22,500 <br /> Palm Trail Roadway Improvements- $11,800 <br /> SE 8th Court Drainage Improvements- $29,670 <br /> Old Animal Control Site Parking Lot Improvements- $11,600 <br /> Linton Drive & Catherine Drive Lane Addition- $54,500 <br />69