My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Biscayne Engineering Company, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Biscayne Engineering Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:33:43 AM
Creation date
8/21/2020 10:32:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> STANDARD FORM 330 PAGE 3 <br />4 <br />FDOT District 4 Paul Capewell, PSM (954)777-4581 <br />Biscayne Engineering established primary, secondary and aerial control, using GPS/RTK and conventional methods <br />to obtain topographic DTM data on all the obscured areas identified by the aerial firm as well as elevations on all soft <br />surfaces (natural ground) areas; performed drainage and underground utility surveys; established Baseline of Sur- <br />vey and R/W lines within the project limits and prepared a PNC sheet. Per the District request, High Definition Laser <br />Scanning was used to survey the I-95 underpasses for the three State Road crossings located within the project lim- <br />its (SR 858, SR 824 and SR 820). TopoDOT was used for the extraction or 3D topographic data from the point cloud <br />to prepare the typical FDOT deliverable. The total cost for this project is $561,026. <br />Size: Approximately 5.1 miles. <br />Boca Raton, Florida <br />47
The URL can be used to link to this page
Your browser does not support the video tag.