Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> STANDARD FORM 330 PAGE 3 <br />2016 <br />8 <br />Biscayne Engineering provided Professional Surveying and Mapping Services for David T. Kennedy Park <br />for design purposes. Task included: <br />-Boundary Survey of David T. Kennedy Park, a 20.89 acre site, to establish the limits of the Subject <br />Property. <br />-Topographic Survey to locate all visible improvements within the subject property, with various different <br />elevation grid separations for design and analysis water discharge in different areas. <br />-Tree Survey, including tree species and a tree tabulation. <br />-Provided a Drainage and Sanitary Sewer survey within the property limits and adjacent roadway. <br />-Provided Utility Designations (Quality Level B), surveyed the designated utilities and incorporated into <br />final Topographic Survey Map. <br />-Performed a partial Hydrographic Survey. <br />51