Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> STANDARD FORM 330 PAGE 3 <br />10 <br />2015 <br />Biscayne Engineering provided Surveying and Mapping Services for the City of Miami Capital Improvements. Tasks <br />included: <br />A Boundary and Topographic survey was prepared. Re-established Boundary Lines and set Property Corner monu- <br />ments. Show all existing site improvements, trees, parking areas, surface and overhead utilities, including invert and <br />bottom elevation. This property has a water boundary. A Mean High Water Line survey was performed to establish the <br />current southerly boundary of the Park and the Northerly limits of the Miami River and submitted to the FDEP for filing. <br />The total cost for this project is $54,900.00 <br />53