Laserfiche WebLink
12. NAME I13. ROLE IN THIS CONTRACT 114. YEARS EXPERIENCE <br />Hugo Soto, P.E. Aronmental Engineer..._ Principal -in -Charge a. TOTAL b. WITH CURRENT FIRM <br />(PIC) 1 40 12 <br />Geotechnical Services: PIC/QA/QC Reviewer <br />15. FIRM NAME AND LOCATION (City and State <br />Terracon Consultants, Inc. (Miami Lakes, FL) <br />16. EDUCATION DEGREE AND SPECIALIZATION 17. CURRENT PROFESSIONAL REGISTRATION STATE AND DISCIPLINE) <br />B.S./Civil Engineering M.S./ Geotechnical JProfessional Engineer/Florida, Civil Engineering <br />18. OTHER PROFESSIONAL QUALIFICATIONS Publications, Organizations, Trainin , Awards, etc. <br />Affiliations: American Society of Civil Engineers Cuban Society of Engineers <br />PROJECTS19. RELEVANT <br />t11 T1TLF AND LOCATION 1City and State/ 1 (2) YEAR COMPLETED <br />e Principal Engineer. The $213 million large scale construction project consisted of a 20 -story building with more than 70 courtrooms <br />within the 714,000 -square foot (SF) facility. Terracon performed a subsurface exploration program and geotechnical engineering <br />evaluation to determine if the auger cast piles were a suitable type of foundation system for support of the structure. Recommendations <br />for the foundation design and related construction were furnished. Terracon also provided construction materials testing and inspection <br />services. The scope of work entailed pile load test analysis and pile length recommendations, pile construction monitoring, post tension <br />monitoring, and sealant special inspections. Firm's Fee: $216,000 estimated <br />STANDARD FORM 330 (REV. 8/2016) 46 <br />1-95 Express Lanes Phase 3113-1 Design/Build (DIB) Project, FDOT District 4 PROFESSIONAL SERVICES <br />CONSTRUCTION tlfapplicablel <br />N/A <br />Broward and Palm Beach Counties, FL Ongoing <br />f3) BRIEF DESCRIPTION iBriefscope, size, cost, etc.).AND SPECIFIC ROLE ® Check if oro'ect performed with current firm <br />Authorized Project Reviewer (APR)/Quality Reviewer. The project extends from South of SW 10th Street to South of Glades Road and <br />includes converting the existing High Occupancy Vehicle (HOV) lanes to High Occupancy Toll (HOT) and widening that will result in two <br />a <br />tolled Express Lanes in each direction. The improvements will result in the roadway widening, two bridge widenings and one bridge <br />replacement, MSE wall and sound barrier wall construction. In addition, there will be miscellaneous cantilever and overhead sign <br />structures. As a member of the D/B team, Terracon has been performing soil exploration, geotechnical classification laboratory testing, <br />standard foundation studies. The firm is currently involved in post design services for 313-1. Firm's Fee: $631,565 estimated. Terracon <br />is also providing Contractor Quality Control (CQC) services for the Contractor. The scope of work includes soils testing for embankment <br />and walls, concrete testing for drilled shafts and bridge decks, auger cast pile testing, and PDA testing. Firm's Fee: $620,696 estimated <br />(1) TITLE AND LOCATION (Cily and State' <br />2 YEAR COMPLETED <br />_ <br />48 -inch Diameter Water Main Downtown Loop Closure <br />PROFESSIONAL SERVICES CONSTRUCTION (1fapplicable) <br />Miami, FL <br />2018 N/A <br />(3) BRIEF DESCRIPTION Briefscope, size, cost, etc. AND SPECIFIC ROLE ® Check if project performed with current firm <br />b' <br />APR/Quality Reviewer. The 48 -inch diameter water main will be constructed under railroad tracks and roadway at the Miami Loop, <br />along NW 12th Street between NW 1st Avenue West and NW 1st Avenue East. Terracon provided geotechnical exploration services <br />including drilling borings. The purpose of these services was to provide subsurface field exploration, laboratory testing information, and <br />geotechnical engineering recommendations to assist in the design and construction of the water main. Firm's Fee: $11,987 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Keystone Park Playground <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (ffapplicabfe) <br />2017 <br />1N/A <br />North Miami, FL <br />(3) BRIEF DESCRIPTION Briefscope, size, cost, etc.) AND SPECIFIC ROLE X- Check if project performed with current firm <br />Principal Engineer. Subsurface exploration and geotechnical recommendations were provided to remediate the depression on the <br />C. <br />playground at the keystone park. The purpose of these services was to provide information and geotechnical engineering <br />recommendations relative to subsurface soil conditions; results of the evaluation; soil and bedrock conditions; groundwater conditions; <br />identification of unsuitable/problematic soil conditions; and recommendations for soil remediation. Terracon also performed earthwork <br />observations and construction materials engineering and testing services during construction of the Keystone playground play surface <br />replacement project. Firm's Fees: $15,662 <br />(1) TITLE AND LOCATION Cify and State J 2) YEAR COMPLETED <br />_ <br />Norwegian Cruise Line (NCL) Cruise Terminal (CT) B, PortMiami <br />PROFESSIONAL SERVI21 <br />CONSTRUCTION (1fapplicable) <br />2017 <br />N/A <br />Miami, FL <br />(3) BRIEF DESCRIPTION {Briefscope, size, cost, etc. AND SPECIFIC ROLE ® Check if project performed with current firm <br />d. <br />APR/Quality Reviewer. The project includes a new CT building and six -story parking garage with associated port infrastructure. The <br />new terminal is located on Dodge Island along the norther end of the port. Terracon performed geotechnical exploration to evaluate <br />the subsurface conditions at the project site and provided geotechnical engineering data relative to the geotechnical site characterization <br />information including subsurface soil/rock conditions, earthwork, floor slab design and construction, pavement design and construction, <br />groundwater conditions, and foundation design and construction. Firm's Fee: $59,087 <br />i 1; TITLE AND LOCATION (City and State 2 YEAR COMPLETED <br />Broward County Courthouse <br />PROFESSIONAL SERVICES 1CONSTRUCTION !f a licable <br />2016 N/A <br />Fort Lauderdale, FL <br />3' BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE ® Check if project performed with current firm <br />e Principal Engineer. The $213 million large scale construction project consisted of a 20 -story building with more than 70 courtrooms <br />within the 714,000 -square foot (SF) facility. Terracon performed a subsurface exploration program and geotechnical engineering <br />evaluation to determine if the auger cast piles were a suitable type of foundation system for support of the structure. Recommendations <br />for the foundation design and related construction were furnished. Terracon also provided construction materials testing and inspection <br />services. The scope of work entailed pile load test analysis and pile length recommendations, pile construction monitoring, post tension <br />monitoring, and sealant special inspections. Firm's Fee: $216,000 estimated <br />STANDARD FORM 330 (REV. 8/2016) 46 <br />