<br />For the Lincoln Park Project, GBTS prepared a Phase I Environmental Site Assessment, an EPA-required Quality Assurance Project
<br />Plan (QAPP), and a Preliminary Phase II Environmental Site Assessment. Expanded soil and groundwater assessment and
<br />consideration of a feasibility study and risk assessment were conducted in 2001 and 2002. GBTS served as a liaison between C FL,
<br />FDEP and community activist groups who were concerned about public health issues. Based on GBTS’s research and advice, the
<br />park was closed to public access, and negotiations conducted with FDEP to develop a Risk-Based Corrective Action (RBCA) closure
<br />solution. GBTS prepared a Conceptual Remedial Action Plan in 2003/2004, whi ch was approved by the FDEP. The protective cap
<br />was installed and the Park redesigned and reopened. Subsequently, GBTS completed the assessment of the former Trash Transfer
<br />Station site and adjoining Durrs Neighborhood, and implemented a remediation/cappi ng project in the adjoining right-of-way and
<br />on two residential properties. GBTS is the process of implementing the long -term groundwater monitoring plan, assisting the City
<br />Attorney’s office with drafting Restrictive Covenants, and providing technical as sistance for potential litigation.
<br />
<br />For the Linear Park Project, GBTS conducted a Limited Phase I ESA and Environmental Inventory for the commercial properties
<br />located along the FEC Railroad corridor. The findings were presented in a GIS-format, which were used to help design the footprint
<br />of the proposed Linear Park. The remaining grant funds were used for several other Limited Phase I ESA/ Environmental Inventory
<br />Studies throughout the Brownfields Area, with findings presented in a GIS format. Addition ally, GBTS subcontracted Dickey
<br />Consulting to manage the Environmental Justice portion of the Brownfields Pilot Grant.
<br />
<br />Cost: $150,000 - Petroleum Remediation / Cost: $120,000 - Brownfields Assessment / Cost: $1,200,000 – Lincoln Park Complex
<br />Assessment & Remediation Project / Role: Senior Technician
<br />
<br />d.
<br />(3) TITLE AND LOCATION (City and State)
<br />
<br />SOUTH FLORIDA AFFORDABLE HOUSING DEVELOPER PORTFOLIO -
<br />ENVIRONMENTAL SERVICES, VARIOUS COUNTIES, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If
<br />applicable)
<br />2004 - Ongoing N/A
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />
<br />Project Professional: GBTS has an ongoing relationship with Pinnacle Housing Group to provide environmental consulting servi ces
<br />related to their acquisition, financing, and redevelopment projects in Florida. The bulk of the work was completed in Broward and
<br />Miami-Dade Counties, but also extends northward into Palm Beach and Martin Counties. GBTS performs a wide-range of
<br />environmental consulting services, including radon surveys, environmental due diligence services (Phase I ESAs, Phase II ESA,
<br />Asbestos-Containing Building Material Surveys, Lead-Based Paint Assessments, Indoor Air Quality and Mold Assessments),
<br />regulatory-driven environmental services (Site Assessment Reports, Remedial Action Plans, Source Removal, Tank Closure
<br />Assessments, Groundwater Monitoring Only Plans, and Engineering Control Verification), Brownfields Consulting Services, and mold-
<br />abatement services. GBTS has conducted Radon Screening of the ground floor units at several apartment complexes, and retail
<br />strips. The units were tested for the presence of radon gas using charcoal adsorption devices.
<br />
<br />Cost: $1,077,142 Role: Staff Professional / Senior Technician
<br />e.
<br />(4) TITLE AND LOCATION (City and State)
<br />
<br />Great Salt Pond Municipal Solid Waste Landfill and Hurricane Irma
<br />Debris Site / Soualiga Road, St. Maarten
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If
<br />applicable)
<br />2020 N/A
<br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />
<br />GBTS conducted a Baseline Environmental Assessment, which was part of an overall Environmental Impact Site Assessment. The
<br />assessment included soil, groundwater, vapor and surface water sampling. The goals were to establish the baseline environmental
<br />conditions prior to the redevelopment of the landfill and the performance of fire suppression activities.
<br />
<br />Cost: $34,000 Role: Staff Professional / Senior Technician
<br />
<br />
<br />Page 53
|