Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Adriana Savino-Miller Principal - Master Planning a. TOTAL b. WITH CURRENT FIRM <br />30 26 <br />15. FIRM NAME AND LOCATION (City and State) <br />Savino & Miller Design Studio, P.A., North Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />University of Pennsylvania, M. Arch + Urban Design Certificate <br />Universidad Central de Venezuela, Architecture <br />Registered Architect, Florida <br />AR#14444 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />AIA Member <br />12 FLASLA Awards, among others <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />City of Miami Beach Future Community Park <br />Miami Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016-present <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />The goal of this 19-acre park project is to improve the quality of life by becoming a model of resiliency and sustainability for <br />the City, while serving as a place for recreation and fitness, quiet contemplation, community gathering and cultural enhance- <br />ment. Scope: Scope: SD-CA, Hardscape, Planting, Site Furniture, Water Feature, Lighting. Principal - Master Planning <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Miami Baywalk & Riverwalk Design Guidelines <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2017-2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The Miami Baywalk & Riverwalk Design Guidelines was conceived to transform 4.5 miles of often hidden, publicly accessible <br />waterfront into a vibrant, resilient, and connected waterfront. A lengthy analysis and public outreach process led to the creation <br />of a family of unifying design elements and guidelines that adopt the latest approach in sustainability and resiliency strategies. <br />Scope: Design Guidelines and Brand Development. Principal - Urban Designer <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDMatheson Plantation Village <br />Key Biscayne, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Master plan through the restoration of three historic cottages, a reminiscence of Key Biscayne when the Matheson Family <br />donated land to the County. The plan calls for a sustainable village that exemplifies cultivation, conservation and stewardship <br />of the land with activities that recall Key Biscayne’s past, including the zoo, first introduced by the Mathesons. <br />Associate <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDMuseum Park <br />Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Re-designed and valued engineered proposed Baywalk and Entry promenade to keep integrity of original Concept. Scope <br />included Paving, Planting, Irrigation, Urban furniture and lighting. Scope: SD-CA, Planting, Hardscape, Water Feature, Lighting <br />and Urban Furniture (19 Acres) Cost: $10M. Principal - Master Planning. <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDTamiami Canal Tender House <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firmSite analysis and presentation of multiple options for site design, including whether to remove or replace the historic swing <br />bridge, how many lanes for new bridge and relocation of tender house. Design of new tender house and bridge railing. <br /> <br />Design Architect and Urban Designer <br />Page 56