My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jorge A. Gutierrez Architect, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Jorge A. Gutierrez Architect, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:45:56 AM
Creation date
8/21/2020 10:44:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Engineering Services (Ongoing) <br />655-96th Street <br />Bal Harbour, Florida 33154 <br />Point of Contact: <br />Mike Alvarez, CGC, PWLF <br />Utility Compliance Officer <br />Phone Number: <br />786.566.3562 <br />Email Address: <br />MAlvarez@balharbourfl.gov <br />CGA has provided continuing professional services to the Bal Harbour Village since 2017. Services <br />include: <br />Calvin, Giordano & Associates, Inc. (CGA) began providing professional services to Bal Harbour Village in <br />2017. Currently, CGA has a Continuing Engineering Services Agreement with Bal Harbour Village in order <br />to assist the Village in various design projects and plan review services. These services include Civil <br />Engineering, Electrical Engineering, Surveying, GIS, and Construction Services. <br />On-going services for Bal Harbour Village: <br />•Building Department Public Works Plan Review and Utilities Plan Review <br />•Sunshine 811 Services – Manage Dig Tickets and Design Ticket Response <br />•Florida Department of Environmental Protection – NPDES Annual Reporting, MDC MS4 TMDL <br />Prioritization Plan and Assessment Plan <br />•Miami-Dade County Department of Regulatory and Economic Resources Reporting – Sanitary <br />Sewer System Modeling and Water Usage Reporting <br />•GIS Database Verification and Updates – Water, Sewer, Drainage, and Site Lighting <br />•Current Design / Construction Projects <br />•P.S. No. 1 Drainage Improvements – Project Management, Bidding, Engineering During <br />Construction, and Construction Services <br />•Phase-3(a) Infrastructure Improvements – Project Management, Civil Engineering Design, <br />Bidding, Engineering During Construction, and Construction Services <br />•Phase-2(b) Water Main Replacement – Project Management, Exploratory Investigation via <br />Geotechnical Engineering and Subsurface Underground Exploratory <br />•Park Dr. 16” WM Abandonment and Replacement Review – QA/QC of the design plans, <br />Construction Services. <br />Page 113
The URL can be used to link to this page
Your browser does not support the video tag.