My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jorge A. Gutierrez Architect, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Jorge A. Gutierrez Architect, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:45:56 AM
Creation date
8/21/2020 10:44:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Miami Beach (Ongoing) <br />1700 Convention Center Drive <br />Miami Beach, Florida 33139 <br />Point of Contact: <br />David Gomez <br />Senior Capital Project Coordinator <br />Phone Number: <br />305.673.6071 x 6732 <br />Email Address: <br />DGomez@miamibeachfl.gov <br />CGA has provided continuing professional services to the City of Miami Beach since 2004. Services <br />include: <br />•Civil Engineering <br />•Environmental <br />•Planning General <br />•Construction Engineering Inspections (CEI) <br />•Surveying <br />•Landscape Architecture <br />•GIS Services <br />•Traffic Engineering <br />Projects Completed for the City Includes: <br />•Miami Beach North Shore Neighborhood <br />•Block Beach Walk Construction <br />•Electrical Power Distribution Design <br />•Flagler Monument Solar Lighting <br />•Miami Beach South Pointe Park – Pylon Lighting <br />•Middle Beach Recreational Corridor Phase II <br />•Middle Beach Recreational Corridor Phase III <br />•All-Wheels Park Design Studies <br />•North Shore Open Space Park <br />•Police Department Emergency System Bidding and Construction Electrical ASA <br />•Flagler Memorial Monument lighting ASA Update Electrical & Structural Plans <br />•Beach Walk II Phase II – CEI <br />•Middle Beach Phase III – Cultural Resources Assessment Survey <br />•Police Department Roof Structural Analysis <br />•Resiliency Cod eConsultant Services <br />•Atlantic Way Width Redesign Modifications <br />•NBOP Arborist Reports <br />•Middle Beach Recreational Corridor Phase III – Arborist Reports <br />•Police Department Electrical Assessment and Upgrades <br />•Police Department Mechanical Plans for Generator Upgrades <br />•Lummus Park/Indian Beach Park Survey – Middle Beach Recreational Corridor Phase III <br />•Bay Drive Neighborhood Greenway <br />•Urban Forestry <br />Page 115
The URL can be used to link to this page
Your browser does not support the video tag.