My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jorge A. Gutierrez Architect, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Jorge A. Gutierrez Architect, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:45:56 AM
Creation date
8/21/2020 10:44:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
References <br />Lakdas/Yohalem Engineering, Inc., (L.Y.E.) is typically a Civil/Structural Engineering <br />Subconsultant on a Team with additional discipline subconsultants, led by an architectural firm as <br />the Prime. <br />As a subconsultant, L.Y.E. is not always privy to or notified of the entire estimated construction <br />cost on the project. We are aware of the budget and schedule for the specified Civil/Structural <br />Engineering services we are providing. <br />L.Y.E. did not initiate or submit any change orders for the Civil/Structural Engineering services <br />performed by us on any of the projects referenced below. We are also not aware, nor did we <br />confirm that the agreed upon and contracted initial “design” fees for the Prime for the entire project <br />and all consultants was adhered to for the same reason stated above. <br />L.Y.E was able to successfully adhere to our scope of work, original budget and schedule through <br />experience, talent and diligence. <br />NE 1st Street Bridge, City of Fort Lauderdale <br />Scope: Structural Condition Survey and Load Rating Analysis, Analysis and Design for <br />Renovation and Construction Phase Engineering Services and Certification. <br />Cost: $435,000 <br />Responsibilities: Engineer of Record; Design and CEI Services <br />Contact: Raymond Nazaire, PE, CGC, City of Fort Lauderdale <br />101 North Andrews Avenue, Fort Lauderdale, FL 33301 <br />Phone: (954) 828-8954– E-mail: rnazaire@fortlauderdale.gov <br />Sherman Street Bridge (over 10 bridge, marina and pier structures), City of Hollywood <br />Scope: Structural Condition Survey and Load Rating Analysis, Analysis and Design for <br />Renovation and Construction Phase Engineering Services and Certification. <br />Cost: $245,000.00 <br />Responsibilities: Engineer of Record; Design and CEI Services <br />Contact: Moshe Anuar, City of Hollywood, Department of Utilities <br />2600 Hollywood Blvd., Room 308, Hollywood, Fl. 33022 <br />Phone: (954) 921-3990 – E-mail: MANUAR@hollywoodfl.org <br />Margate Bridge, City of Margate <br />Scope: Structural Condition Survey and Load Rating Analysis <br />Cost: $350, 000 <br />Responsibilities: Engineer of Record, Condition Survey and Engineering Design Services <br />Contact: Abidemi Ajayai, PE, PMP, LEED A, City of Margate <br />901 NW 66 Avenue, Margate, FL 33063 <br />Phone: 954-972-0828 – Email: aajayi@margatefl.com <br />Page 129
The URL can be used to link to this page
Your browser does not support the video tag.