My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jorge A. Gutierrez Architect, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Jorge A. Gutierrez Architect, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:45:56 AM
Creation date
8/21/2020 10:44:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF SUNNY ISLES BEACH <br />Request for Qualifications No. 20-07-01 <br />Professional Services <br />Continuing Professional Consulting Services (CCNA) <br />Request for Qualifications No. 20-07-01 GREEN • SUSTAINABLE • HIGH PERFORMING ARCHITECTURE <br />➢JAG would attend meetings either by phone or in person whichever the City of Sunny Isles Beach prefers <br />to discuss the needs and budget that will ultimately dictate the scope of <br />work. <br />➢With scope in hand, JAG would develop a schedule and project <br />milestone schedule and start work on a set of schematic plans. <br />➢We will work with our engineers to accommodate any necessary system <br />spaces into the early phases of design as this can affect available space <br />and layout. <br />➢Preliminary drawings would be developed to review with the City of <br />Sunny Isles Beach staff and at that time, we may make alternative design <br />recommendations to meet your goals and budget. <br />➢If necessary, JAG would conduct an in-depth site evaluation and/or <br />existing conditions survey <br />➢Regularly scheduled meetings and communication with the City of Sunny Isles Beach <br />➢Site visits to observe, or inspect construction progress <br />Examples of Minor & Major Architectural Projects: <br />➢Repairs, modifications, alterations, and new construction projects <br />➢Safety and Security Assessments <br />➢ADA Review and Remodel <br />Architecture <br />➢Planning, programming, design, preparation of construction documents, permitting and construction <br />supervision. <br />Construction Management <br />➢Identification of potential problems, utility coordination, inspection of all stages of the <br />construction/installation, scheduling and cost estimation, claims review, <br />shop drawing review and approval, inspection reporting and documentation, <br />and preparation and submittal of punch lists, as-built plans, record drawings <br />and close-out documents. <br />ADA Consultant <br />➢ADA surveys, the analysis of existing public programs, and the development <br />of barrier removal plans that include architectural solutions, plans, and <br />program modification recommendations to satisfy Title II and/or or Section <br />504, and Fair Housing compliance requirements. <br />Page 13
The URL can be used to link to this page
Your browser does not support the video tag.