|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Jorge A. Gutierrez, AIA, LEED AP
<br />13. ROLE IN THIS CONTRACT
<br />Principal/Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />30+
<br />b. WITH CURRENT FIRM
<br />10
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Jorge A. Gutierrez Architect, LLC, Miami Lakes, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)Bachelor of Architecture, Louisiana State University 1988 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Registered Architect – Florida 1993
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />NCARB Certificate, LEED Accredited Professional, Florida Green Building Coalition, Florida Certified Building Contractor (Ina ctive),
<br />Resident Review Panel Member of the City of Miami Beach Planning and Zoning Board Member Town of Surfside
<br />19. RELEVANT PROJECTS
<br />a.
<br />* Public Services Facility, Sunrise, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Petroleum Lab is a new 5,472 SF building with site improvements, offices and laboratory for the department of agriculture. Tenant
<br />Building is a 6,778 SF office building for the department local offices and a future restaurant, including site improvements. Cost:
<br />$3,562,000 Role: Architect of Record
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Shores Brockway Memorial Library Children’s Addition Feasibility
<br />Design, Miami Shores, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2009
<br />CONSTRUCTION (If applicable)
<br />2011
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Feasibility study for the remodeling/renovations and addition to the existing space. Preliminary design for existing library spaces and
<br />addition. 1,000 SF Remodeling and 1,000 SF Addition. Role: Architect of Record
<br />c.
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2007
<br />CONSTRUCTION (If applicable)
<br />2009
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />d.
<br />(1)TITLE AND LOCATION (City and State) *Weston Public Works, Weston, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />16,000 SF Fleet Maintenance Facility encompasses six garage bays and related administrative and support areas. A separate fuel station
<br />facility was also included in the project's scope. Provisions were made for adequate parking and outdoor storage facilities as well as a
<br />lushly landscaped perimeter buffer. Role: Architect of Record while principal at another firm *
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />STANDARD FORM 330 (REV. 8/2016)
<br />State Farmers Market Petroleum Lab and Tenant Building,
<br />Pompano Beach, FL
<br />Designed, developed, and constructed over a phased multi-year period, Sunrise’s Public Services’ park encompasses an elegant,
<br />ample, and well-ordered area that serves a population of 85,000. Tilt-wall construction provided an effective, cost-efficient solution in
<br />terms of material and energy savings, strength, insulation, and durability. Role: Architect of Record while principal at another firm *
<br />Tropical Research and Education Center (TREC) Laboratory Buildings
<br />Remodeling, Homestead, FL
<br />Laboratory additions and remodeling of existing laboratories at the University of Florida Tropical Research and Education Center.
<br />Enlarged existing laboratory facilities, modernize laboratories with new air conditioning, fire alarm, plumbing, electrical systems, finishes,
<br />millwork, offices. Work on existing occupied facilities while the work was built. Cost: $1,615,000.00 Role: Architect of Record
<br />2016 2017
<br />X
<br />Page 21
|