My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jorge A. Gutierrez Architect, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Jorge A. Gutierrez Architect, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:45:56 AM
Creation date
8/21/2020 10:44:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED <br />TEAM'S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not <br />specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />5 <br />21. TITLE AND LOCATION (City and State) <br />Addition Renovations and IAQ Harbordale Elementary School , <br />Ft. Lauderdale, Florida * <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2005 <br />CONSTRUCTION (If applicable) <br />2007 <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNERS <br />Broward County Schools <br />b. POINT OF CONTACT NAME <br />Dave Archer <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />954-249-3904 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The project was composed of what could be considered a series of separate building types and elements, including a new <br />administration suite with accessible point of entry, a new Food Service/Multipurpose building with restricted area, replacement of <br />campus FPL service equipment, upgrade campus chiller distribution capacity, replacement of campus Fire Alarm System, <br />replacement of campus emergency lighting systems, replacement of campus intercom systems to new emergency generator, and IQA <br />improvements to existing building 11. <br />All of the work was performed within extreme site limitations while maintaining safe school operation. Complex work scope. <br />Project Cost: Cost: $5,000,000 <br />* Individual Experience <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Jorge A Gutierrez Architect LLC <br />(2) FIRM LOCATION (City and State) <br />Miami Lakes, Florida <br />(3) ROLE <br />Architect of Record <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />STANDARD FORM 330 (REV. 8/2016) PAGE <br />Page 85
The URL can be used to link to this page
Your browser does not support the video tag.