Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Jason McKoy <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />12 <br />b. WITH CURRENT FIRM <br />5 <br />15. FIRM NAME AND LOCATION (City and State) <br />Premiere Design Solutions, Inc. – North Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Masters in Architectural Professional Studies, <br />Leeds Metropolitan University, Leeds, UK <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Registered Architect A.R.B. UK – No. 072168l <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Btec National Diploma in Computer Graphic Design, The Sheffield College <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Hard Rock Stadium Pedestrian Bridges and Tunnels, City of <br />Miami Gardens, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. McKoy assisted in this project which the preparation of drainage design and underground utility investigation and design. <br />The project had a very aggressive schedule, requiring to build two pedestrian bridges and two pedestrian tunnels at the Stadium <br />in anticipation of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the <br />dedication of land and aerial easements for the new structures in private property. The project total cost is $16 Millions. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />FLL Westside Watermain Loop, Broward County Aviation <br />Department, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />This water main project was following the Water System Master Plan and was designed by Mr. McKoy was the RPR (resident project <br />representative) and provided full time inspections and construction administration services, including responsible of all coordination <br />of work between different department of Miami Dade Aviation Department, FAA and the contractor. Mr. McKoy inspected installation <br />of over 5,000 LF of 16 and 12-inch diameter DIP water mains, with taps, air release valves, asphalt pavement restoration including <br />airside concrete apron restoration and all the required coordination. Mr. McKoy also participated in the preparation of record <br />drawings and final project certification, punch-list and closeout. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />CBIS/CBRA/BHS Program Civil Engineering at Miami <br />International Airport, Miami-Dade Aviation Department, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />The South and Central Terminals (CBIS) / Checked Baggage Reconciliation Areas (CBRA) / Baggage Handling System (BHS) <br />Program is a part of a $160 Million dollar program to centralize all baggage operations of these two terminals in a new modern <br />facility. The Engineering phase, estimated at $1.6 Million included a new 4 Stories-70,000 SF building, and necessary <br />modifications to the Central and South Terminals to accommodate the new Baggage systems. Mr. Mckoy assisted in the <br />Construction Management for the civil component of the program. Tasks completed included the design and inspection of new <br />water and sewer services for the building, underground utility coordination, concrete pavement design, pavement markings, <br />signage, and maintenance of traffic. Project also included necessary civil coordination for the design and inspection of a <br />temporary baggage make-up device requiring a 12” fire line relocation, new monitoring wells, and cleanout relocation. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Broward County Transit – Professional Services Agreement in <br />an Ongoing Basis, Broward County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. McKoy was Project Manager working at Broward County as in-house staff overseeing and scheduling work for the development <br />and construction of over 1,000 bus stops including but not limited to bus stops, bus shelters, bus bays, bike lanes, curb and gutter, <br />landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater improvements and bus shelter pads. In addition, <br />Mr. Jurado prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the <br />proposed improvements. The utility coordination for this project was very rigorous since many of the bus stops were located within <br />high dense urban areas with reduced right-of-way space. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />North Perry Airport Park and Ride Facility, Pembroke Pines, <br />FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Mr. McKoy served as the Project Construction Manager for the development of a Park and Ride Facility at the North Perry Airport <br />located on the northeast corner of Pembroke Road and University Drive in the City of Pembroke Pines. The site development <br />included the design of the parking facility including a drainage and lighting system to serve riders of the Broward County Transit <br />System, and a reconfiguration of the parking lot. Mr. McKoy was responsible for the coordination of permitting with the local <br />governmental agencies and overseeing construction of this facility for Broward County Transit and the City of Pembroke <br />Pines. Project was fast track and required expedited completion to secure federal funds. <br />55