My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ross Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Ross Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:04:54 AM
Creation date
8/21/2020 11:03:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
J>oriar) <br />Miami-Dade Water and Sewer Department <br />Task Authorization for A & E Consultants <br />i~J\r-'i I -'.;:-\l~' <br />SL~·~-·L;':""--,'~i (. <br />To:ROSS ENGINEERING INC. <br />Attn: Melissa Ross <br />17670 NW 78th Avenue,Suite 214 <br />Miami,Florida <br />Authorization Date:Date signed by Director. See below <br />B;22 <br />Proposal Date:11/30/2019 <br />c ,\;r sADr,i .:>~i;:••~T ION Agreement No.:_1_7_R_E_10_0_1 _ <br />Project Title <br />\Design and Limited Construction Support <br />Services (Basin D2-C-1,North Basin;Water and <br />Sewer Piping Only) <br />Scope of Work \Design and Limited Construction Support Services <br />(Basin D2-C-1,North Basin;Water and Sewer Piping <br />Only) <br />Approximately 18,150 LF of water and sewer piping <br />(gravity,water main and force main)in the area north <br />of NW 22nd Avenue and NW 90th SI. <br />Anticipated Task P 6 -#1'7 Fl E 1:.00 j 0..1 <br />Completion Date: <br />31-Dec-2020 PCTS Project No.:15158 <br />Project Manager:Project Manager: <br />(Consultant)Melissa Ross (MD WASD)Juan Curiel,P.E. <br />E-Mail Address:mross@rossengineers.com E-Mail Address:Juan.Curiel@miamidade.gov <br />Main No:786-552-8399 <br />No:786-468-8304 Main No:786-552-8399 <br />ISD Project Number:--=E:_:_1_:_5-:_:_W_:_A:_:_S_:_D_:_-:_:_0:_:3.:_A:___ <br />Task No.:003-------------------------- <br />Revision No:REV 00--------------------------- <br />Approved Fee for this <br />Authorization: <br />_.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.. <br />Total Authorized Task Fee: <br />Lump Sum <br />Time and Material,not to <br />Exceed: <br />Allowances: <br />$465,245.31 <br />RECEIVED <br />ProjectiER No.:S049850,W017253 <br />FROM DIRECTOR'S OFFICE Capital Plan Project No 1047,1084 <br />JAN 9 -2019 Capital Plan Sub- <br />Project No 103000,102243 <br />CONTRACT COMPLIANCE Project Amount <br />$465,245,31 &MONITORING DIVISION Available:15,196,229.00 <br />$449,950.31 As of:12/3/18 <br />Org.O&M Source <br />$15,295.00 Fund No.Activity Account Location Type Project Activity <br />EW647 WS96020 721121 Douglas other Design <br />N/A <br />EW260 WS96020 721121 Douglas other Designzt··_··_··_··_··_··_··_~··'_··_·· <br />,""0 J.A'roo IZ/*~~~M,tll'h <br />Division ORSection Chief Assistant Director Capital Programs <br />N/A <br />Date Date <br />-++J,:~-----L-_/-_I~~~!Ib_--H-ar""""-dee+p A-nan~d,~p.E...,....-,~.L...!.......:. <br />Waste and Sewer DeputyDirector <br />Capital Improvements &Regulatory Compliance <br />Assistant Director <br />WasteWaterSystemOperations <br />$;,L:2-z--k~·/1 <br />Chief Financial Officer <br />FinanceDivision <br />=crs 1 Proliance <br />Date <br />Director <br />Form Created:12/3/20182:04 PM <br />Page 66
The URL can be used to link to this page
Your browser does not support the video tag.