Laserfiche WebLink
Universal Engineering Sciences | 51 <br />F. Firm References and Similar Work Completed <br />The project consists of constructing a 108,350 sf enclosed dry storage <br />facility will replace an existing dry stack marina containing 260 open- <br />rack dry storage units. The project also includes a pile-supported slab- <br />on-grade for forklifts. Additionally, floating docks will be constructed <br />in Biscayne Bay. The project also includes sheet piling to bring the site <br />to grade. The project required the construction of site work, which <br />included drainage, paved parking, lighting, irrigation, and landscaping. <br />This project is being constructed at Haulover Beach Park, which is <br />owned by Miami-Dade County Public Works Department. <br />UES was retained to serve as the Threshold Inspector for the <br />construction of the building. UES is kept strict records of all deficiencies <br />on the project. UES provided materials testing services for the <br />complete project. Testing services included laboratory Proctor testing, <br />soil classification, in-place density testing, backscatter testing, grout <br />cylinder casting, concrete cylinder casting, and compressive strength <br />testing. <br />Westrec Haulover Marine Center <br />Miami Beach, Florida <br />Scope of Services: <br />Pile Inspections, Load Tests, <br />Materials Testing, and Threshold <br />Owner: <br />Westrec Haulover Equities <br />678.618.0212 <br />Contact Information: <br />Narvel Lassiter, Project Manager <br />678.618.0212 <br />nlassiter@westrec.com <br />Assigned Personnel: <br />Reinaldo Villa, MS, PE <br />Peter Read, PE <br />Steve Jaime, EO <br />Bobbie Villa <br />Approximate Universal Fee: <br />$80,000.00 <br />Completion Date: <br />08/2016