My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 61 <br />F. Firm References and Similar Work Completed <br />WDW DC-6 Tower Static Load Testing <br />Orlando, Florida <br />Static Load Testing on helical pier piles for a cellular <br />tower. EOR responsible for designing the static load test, <br />performing the test, and analyzing the data. <br />Nocatee Parkway <br />St. Johns County, Florida <br />Responsible for performing CSL testing and analysis on 15 <br />drilled shafts throughout the development. <br />SR 30 over Aucilla River <br />Perry, Florida <br />Supervised boring operations and performed drilled shaft <br />inspection, Mini-SID services on a large drilled shaft project <br />for FDOT. <br />Hathway Bridge Repairs <br />Panama City, Florida <br />Performed GPR on internal bridge diaphragms prior to <br />coring for post-tension cables.
The URL can be used to link to this page
Your browser does not support the video tag.