My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Universal Engineering Sciences
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Universal Engineering Sciences
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:06:57 AM
Creation date
8/21/2020 11:06:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Universal Engineering Sciences | 63 <br />F. Firm References and Similar Work Completed <br />Education <br />BS, Civil Engineering, <br />Venezuela <br />Years of Experience <br />37 <br />Certifications <br /> â– Registered Engineering <br />Intern, FL <br />PROJECT EXPERIENCE <br />Replacement of 54-Inch Diameter <br />Sanitary Sewer Force Main Tunnel from <br />Virginia Key to Fisher Island <br />Florida <br />Gaetano is currently involved as field <br />instrumentation specialist for the 10-foot <br />diameter bored tunnel. Duties include <br />planning, coordinating, and supervising <br />instrumentation installation for the <br />tunnel project, which include installing <br />and monitoring of vibrating wire strain <br />gauges, thermistors, inclinometers, <br />extensometers, surface monitoring <br />points, utility monitoring points, vibration <br />monitoring and tilt sensors. Duties also <br />include reviewing instruments and <br />readout units shipped to the office; <br />prepare pre-installation, installation <br />and post-installation worksheets; and <br />prepare post-installation package for each <br />instrument installation. <br />251156-3-52-01 Port of Miami Tunnel <br />and Access Roadways <br />Miami, Florida <br />Gaetano was involved monitoring <br />mass concrete pours for sign structure <br />pile caps and columns. Mass concrete <br />monitoring included installation of <br />IntelliRock thermocouples, monitoring of <br />temperature readings in accordance with <br />monitoring plan, and field reporting. <br />HEFT Roadway Improvements from SW <br />216th to SW 184th Streets <br />Districtwide, Florida <br />Gaetano was involved in monitoring <br />mass concrete pours for sign structure <br />drilled shaft foundations. Mass concrete <br />monitoring included installation of <br />IntelliRock thermocouples, monitoring of <br />temperature readings in accordance with <br />monitoring plan, and field reporting. <br />Westrec Haulover Marine Center <br />Miami, Florida <br />Gaetano was involved with the <br />installation of ten Geokon vibrating wire <br />strain gauges for the performance of axial <br />compression pile load testing. Gaetano <br />was the field engineer throughout the <br />performance of the standard static load <br />test and recorded all strains with Geokon <br />vibrating wire readout unit. <br />Surfside Seawall Replacement <br />Surfside, Florida <br />Gaetano is currently involved performing <br />pre and post-construction surveys and <br />performing vibration monitoring during <br />the driving of concrete piles for the <br />proposed seawall replacement. <br />Gaetano Di Zio <br />Senior Field Inspector <br />Gaetano Di Zio has 37 years of construction materials testing, inspection, threshold <br />and construction related experience for commercial and residential projects. His <br />responsibilities include structural steel welding inspections, fire-proofing inspection, <br />post tension concrete inspection, tilt wall panel inspection, pre-engineered wooden <br />truss inspections, reinforced masonry inspections, moisture emission testing, gloss <br />& slip of burnish concrete surfaces, coring of asphalt and hardened concrete, testing <br />compressive strength of concrete cylinders, sampling and testing of construction <br />materials, installing and monitoring of instrumentation.
The URL can be used to link to this page
Your browser does not support the video tag.