My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Coastal Protection Engineering, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Coastal Protection Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:09:42 AM
Creation date
8/21/2020 11:09:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 1. Lifeguard stand at Pier Park. <br /> <br />There were numerous beach access points, with a few closed due to construction. They include: Ritz <br />Carlton, Trump Tower I, Sayan, Atlantic Island, Pier Park, Jade Signature, Jade Ocean, Irving Diamond, <br />Florida Ocean Club, Sampson Oceanfont Park, Pinnacle, Bresslour, Simon Dezer, Turnberry, Porsche, <br />Millennium, Marenas, Cecile Sippin, Bill Lone, Ellen Wynne, Bennett Lifter, and Regalia. There are small <br />parking lots at some beach access locations. Primary parking is landward behind Walgreens, at parking <br />garages at City parks, or underneath causeways. <br /> <br />At Bill Lone beach access, the beach width was approximately 85 feet from the vegetation line (where <br />existing) to the MHW line. Berm and swash zone was primarily quartz. Beach width in both locations <br />provided ample space for building-supplied and public beach chairs (Figure 3). There was a lifeguard <br />stand, showers, and bathrooms at the beach access (Figure 4). <br />
The URL can be used to link to this page
Your browser does not support the video tag.