|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />CUAUHTEMOC VALLE I Production Manager I 14
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Rodriguez Architects, Inc.
<br />16. EDUCATION (DEGREE AND
<br />BA in Architecture, Florida International University, 2005
<br />16. OTHER
<br />19. RELEVANT PROJECTS
<br />Ii:1��:11aC[tl�
<br />Coral Gables, FL
<br />9TE AND DISCIPLINE)
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Carrie Meek K-8 Center Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2018
<br />I 2019
<br />a.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with Current firm
<br />ROLE: Production Manager SIZE: 4,600 SF COST: $1,524,005.00
<br />SCOPE: New four classroom addition with covered walkway connection
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />South Miami Middle School Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2017
<br />2019
<br />b
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm
<br />ROLE: Production Manager SIZE: 30,000 SF COST: $21724,070.00
<br />SCOPE: Remodeling/Renovation to replace existing windows, HVAC units, restrooms; and painting
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Nautilis Middle School Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2013
<br />2014
<br />I
<br />C.
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br />ROLE: Production Manager SIZE: -1,200 SF COST: Under $2M
<br />SCOPE: Classroom to (Prep lab conversion, repainting, renovations, electrical upgrades, interior paint.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Shenandoah Middle School Miami, FL
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2013
<br />2014
<br />d
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm
<br />ROLE: Production Manager SIZE: -1,200 SF COST: Under $2M
<br />SCOPE: Classroom to (Prep lab conversion, repainting, renovations, electrical upgrades, interior paint.
<br />(1) TITLE AND LOCATION (Cityand State) 1
<br />(2) YEAR COMPLETED
<br />Kinloch Park Middle School Oakland Park, FL
<br />PROFESSIONAL SERVICES I
<br />CONSTRUCTION (Ifapplicable)
<br />2013
<br />2014
<br />e.
<br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br />ROLE: Production Manager SIZE: -1,200 SF COST: Under $2M
<br />SCOPE: Classroom to ]Prep lab conversion, repainting, renovations, electrical upgrades, interior paint.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
|