Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />CUAUHTEMOC VALLE I Production Manager I 14 <br />15, FIRM NAME AND LOCATION (City and State) <br />Rodriguez Architects, Inc. <br />16. EDUCATION (DEGREE AND <br />BA in Architecture, Florida International University, 2005 <br />16. OTHER <br />19. RELEVANT PROJECTS <br />Ii:1��:11aC[tl� <br />Coral Gables, FL <br />9TE AND DISCIPLINE) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Carrie Meek K-8 Center Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2018 <br />I 2019 <br />a. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with Current firm <br />ROLE: Production Manager SIZE: 4,600 SF COST: $1,524,005.00 <br />SCOPE: New four classroom addition with covered walkway connection <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />South Miami Middle School Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2017 <br />2019 <br />b <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm <br />ROLE: Production Manager SIZE: 30,000 SF COST: $21724,070.00 <br />SCOPE: Remodeling/Renovation to replace existing windows, HVAC units, restrooms; and painting <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Nautilis Middle School Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2013 <br />2014 <br />I <br />C. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />ROLE: Production Manager SIZE: -1,200 SF COST: Under $2M <br />SCOPE: Classroom to (Prep lab conversion, repainting, renovations, electrical upgrades, interior paint. <br />(1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />Shenandoah Middle School Miami, FL <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (Ifapplicable) <br />2013 <br />2014 <br />d <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm <br />ROLE: Production Manager SIZE: -1,200 SF COST: Under $2M <br />SCOPE: Classroom to (Prep lab conversion, repainting, renovations, electrical upgrades, interior paint. <br />(1) TITLE AND LOCATION (Cityand State) 1 <br />(2) YEAR COMPLETED <br />Kinloch Park Middle School Oakland Park, FL <br />PROFESSIONAL SERVICES I <br />CONSTRUCTION (Ifapplicable) <br />2013 <br />2014 <br />e. <br />(3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm <br />ROLE: Production Manager SIZE: -1,200 SF COST: Under $2M <br />SCOPE: Classroom to ]Prep lab conversion, repainting, renovations, electrical upgrades, interior paint. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />