|
Armando Sales, PE,
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />Structural Engineer
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Brill Rodriguez Salas & Associates, Inc., Miami, FL.
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />14. YEARS EXPERIENCE
<br />421 29
<br />BSCE University of Havana, Cuba, Civil EIng inear ing,1977
<br />State
<br />of
<br />Florida
<br />Professional Engineer #38007
<br />PROFESSIONAL SERVICES
<br />I State
<br />of
<br />Florida
<br />Licensed Inspector #0978
<br />tB. OTHER PROFESSIONAL QUALIFICATIONS (Publications,
<br />Mr. Solas has diversified experience in Structural Engineering and Structural Design, Investigation, and Inspection
<br />services. Highly skilled in project management and feasibility studies of existing structures.
<br />19. RELEVANT PROJECTS
<br />STANDARD FORM 330 (REV. 7/2018) PAGE 2
<br />(1) TITLE AND LOCATION (City antl State)
<br />(2) YEAR COMPLETED
<br />University of Miami, Continuing Contract, Coral Gables, FL.
<br />PROFESSIONAL SERVICES
<br />I CONSTRUCTION (Ifapplicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />a.
<br />Hired as consultants under an on-going contract to maintain, repair, and renovate every building on campus including
<br />parking garages. To perform structural design, prepare structural plans and specs for new facilities, and inspections.
<br />(1) TITLE AND LOCATION (City and State)
<br />1(2) YEAR COMPLETED
<br />Riviera Country Club - Clubhouse & Fitness Center, Coral Gables, FL.
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2016
<br />2018
<br />I
<br />f)
<br />(3) BRIEF DESCRIPTION (Bnefscope, size, cast, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Brill Rodriguez Sales & Associates, Inc., were hired to perform structural design services and a Structural Peer Review
<br />for the Riviera Country Club at the Pump House, Toilet Shelter, Clubhouse, and the Fitness Center facilities.
<br />(1) TITLE AND LOCATION (Cityand State)
<br />(2) YEAR COMPLETED
<br />MDCPS, Curtis Park Pool and Fieldhouse, Miami, FL,
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2016
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />C.
<br />Structural Engineering Services including design, for a new pool facility replacement with adjacent baseball field, and
<br />restroom building. A budget construction cost of approximately $1.6M.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />Coral Way Community Center, Miami, FL,
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2014
<br />2014
<br />d
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Engineering Services for the remodeling of an existing firehouse into a community center. A budget
<br />construction cost of approximately, $680,000.00.
<br />(1) TITLE AND LOCATION (City and State)
<br />(2) YEAR COMPLETED
<br />University of Miami, Student Activities Center, Coral Gables, FL,
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (Ifapplicable)
<br />2013
<br />2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br />e.
<br />Structural Engineering Services for the new construction, renovation, expansion of existing University Center, and
<br />redesign of main UC Patio. A project size of approximately 119,368 SF and a budget construction cost of $20M.
<br />STANDARD FORM 330 (REV. 7/2018) PAGE 2
<br />
|