Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SLV. LAAWLI <br />nI IAI Wir:ATIn IUC Gr1R THIO rr1NITRAr:T I NUMBER <br />(Present as many projects as <br />The School Board of Broward County, Ft. Lauderdale, FL <br />A/E Proiect Consultant Continuing Contract (1997-2002) <br />or <br />if not specified. <br />23. PROJECT OWNER'S INFORMATION <br />22. YEAR COMPLETED <br />iIONAL SERVICES CONSTRUCTION (If applicable) <br />1997-2002 1 1997-2002 <br />e. PROJECT OWNER <br />2,800 <br />SF (Buildings) / 11 <br />Acres (Playfields) <br />Year: <br />b. POINT OF CONTACT NAME <br />c. POINT OF GUNTAGT 1ELEYHONE NUMtltH <br />The School Board <br />of <br />Broward <br />County <br />Principal -in -Charge, Architect of Record <br />Scott Hennigar <br />while atArchiteknics, Inc. <br />754-765-6403 <br />24. BRIEF DESCRIPTION OF Pfl0 <br />Provide Basic A/E Services at <br />Bovd Anderson Senior Hiah <br />This project included the design and construction of <br />new facilities including concession building, press <br />box, and bleachers. Master planning was also done in <br />order to examine the efficiency of the placement of <br />the new buildings. <br />Cost: $1,292,000 <br />Size: <br />2,800 <br />SF (Buildings) / 11 <br />Acres (Playfields) <br />Year: <br />2002 <br />ROLE <br />Marjory Stoneman Douglas Senior High <br />This project included the re -roofing, water -proofing <br />and window replacement of the entire school along �'� <br />with both interior and exterior remediation done as <br />well. This project sought to repair a building that had <br />failed to withstand the South -Florida climate. The Northeast <br />building was only 5 years old, but the design had <br />failed its expectations. We performed an in-depth <br />study on how the building had failed and proposed a <br />design for renovating the building to prevent future <br />failures and a plan for repairing the damage the <br />building had already endured. <br />Cost: $1,859,000 <br />Size: 140,000 SF <br />Year: 2000 <br />only a small sampling of projects completed: <br />South Broward Senior Hieh <br />This project involved the Master planning study of <br />[he entire campus in order to examine the efficiency <br />and the placement of the new buildings. <br />Cost: N/A <br />Year. 1999 <br />Hallandale Elementary <br />This project involved the Master planning study of <br />the entire campus in order to examine the efficiency <br />and the placement of the new buildings. <br />Cost: N/A <br />Year: 1999 <br />High School <br />This project included the design and construction of <br />new facilities including concession building, press <br />box, and bleachers. Master planning was also done in <br />order to examine the efficiency of the placement of <br />the new buildings. <br />Cost: $1,890,000 a" <br />Size: <br />4.500 <br />SF (Buildings) / 11 <br />Acres (Playfields) <br />Year: <br />2001 <br />ROLE <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />111 FIRM NAME (21 FIRM LOCATION (City and State) (3) <br />STANDARD FORM 330 ( <br />ROLE <br />a, <br />Lourdes Rodriguez, AIA, Principal <br />Miami, Florida <br />Principal -in -Charge, Architect of Record <br />while atArchiteknics, Inc. <br />(1) FIRM NAME <br />(2) <br />FIRM <br />LOCATION <br />(City and State) <br />(3) <br />ROLE <br />b. <br />(1) FIRM NAME <br />(2) <br />FIRM <br />LOCATION <br />(City and State) <br />(3) <br />ROLE <br />C. <br />11) FIRM NAME <br />(2) <br />FIRM <br />LOCATION <br />(City and State) <br />(3) <br />ROLE <br />d. <br />(11 FIRM NAME <br />121 <br />FIRM <br />LOCATION <br />(City and State) <br />13) <br />ROLE <br />e. <br />(1) FIRM NAME <br />(2) <br />FIRM <br />LOCATION <br />(City and State) <br />(3) <br />ROLE <br />f. <br />slzooa) PAGE 3 <br />