My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodriguez Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Rodriguez Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:13:12 AM
Creation date
8/21/2020 11:12:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 pro/acts, if not specified. B <br />Complete one Section F tar each project./ <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />City of Miami, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION Irl appticabL <br />A/E Proiect Consultant Continuine Contract (2014-2016) 2014-2016 1 2014-2016 <br />23. PROJECT OWNER'S INFORMATION <br />City of Miami I Carlos Lozano <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Ilnclude scope, size, and cast) <br />Provide Basic A/E Services at various City Locations. The projects included: <br />Belafonte Tacolcy Park <br />This project involved the re -roofing and clerestory window replacement the existing <br />community center. Renovations included replacement of windows and roofing <br />membrane, while maintaining the existing plywood and wood substructure. <br />Cost: $198,660.00 <br />Year: 2017 <br />MDCR Pre -Trial Detention Center Faciliri <br />Re -roofing scope included raising all existing equipment as required by code, replacement <br />of all existing exhaust fans, re-routing of conduits that were installed on the parapet walls <br />and removal of all abandoned roof equipment. Work was conducted under strenuous <br />conditions due to the use of the building (county jail). Equipment, hours of operation, <br />clearances made for an extended work day. <br />Cost: $555,000.00 <br />Year: 2016 <br />Fire Department/Fire Station Generators <br />Replace existing generators. <br />305-416-1247 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />STANDARD FORM 330 (6/2004) <br />(1) <br />FIRM <br />NAME <br />(2) <br />FIRM <br />LOCATION <br />y <br />and State/ <br />(3) <br />ROLE <br />a <br />Rodriguez Architects, Inc <br />Coral Gables, Florida <br />Principal-in•Charge, Architect of Record <br />(1) <br />FIRM <br />NAME <br />(2) <br />FIRM <br />LOCATION <br />(City <br />and State) <br />(3) <br />ROLE <br />b. <br />(1) <br />FIRM <br />NAME <br />(2) <br />FIRM <br />LOCATION <br />(City <br />and State) <br />(3) <br />ROLE <br />C, <br />(1) <br />FIRM <br />NAME <br />(2)FIRM <br />LOCATION <br />(City <br />and State) <br />(3) <br />ROLE <br />d, <br />(1) <br />FIRM <br />NAME <br />(2) <br />FIRM <br />LOCATION <br />(City <br />and State) <br />(3) <br />ROLE <br />e. <br />(1) <br />FIRM <br />NAME <br />(2) <br />FIRM <br />LOCATION <br />(City <br />and State) <br />(3) <br />HOLE <br />f. <br />PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.