My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodriguez Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Rodriguez Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:13:12 AM
Creation date
8/21/2020 11:12:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT APPROACH AND UNDERSTANDING <br />Kickoff <br />Once the project has been authorized/awarded to us, we will schedule a <br />kick-off' meeting with your project representative and any affected <br />consultants. During this meeting, we will: <br />IL <br />• collect all pertinent project information <br />• assess work timelines <br />• record all project criteria <br />• review and clarify project communication protocols <br />• identify any project specific needs <br />• collect all available existing documentation to take back to the office <br />Program Validation <br />To get your project underway, we assess and evaluate the project's program <br />and unique needs. We will focus on better understanding your goals in <br />relation to the opportunities that the project site presents. We then begin to <br />craft a responsive design proposal that addresses each of your requirements. <br />Roadmap <br />Once a project has begun, regularly scheduled project meetings with <br />consultants and clients allow RAI to keep close watch over your project while <br />making sure that the work of all parties is coordinated during development <br />and not after the fact or in the field. <br />RAI's standard procedures (after the program,. budget and schedule are <br />approved) include the following documents: <br />• Preparation of design criteria checklist <br />• Review and coordination of CPTED guidelines applicable to the project <br />and inclusion of those within the design criteria checklist <br />• Review and confirmation of project specific Code requirements <br />• Review and confirmation of the County Design Criteria and <br />specification specific to the project <br />Development f checklists based h <br />U <br />,� V. , <br />,Aw•rEPa' <br />Erreyurc <br />— <br />0.eP0•fM0. 11 <br />._.._- <br />L <br />Meeting Minutes <br />P. <br />Pd <br />Sitc Visits <br />• eve opment o c ec fists ase on those <br />OEK FIXiMUt/SNA\PAUF•EMFMARY _ <br />requirements <br />enI <br />_ <br />• Preparation of a schedule for phase submittals, <br />including anticipated deliverables at each <br />milestone orr <br />• Preparation of project specific drawing list, <br />specification requirements and checklist <br />Preparation of project specific construction a <br />administration checklist <br />Roadmap /Project Plan <br />These procedures and their respective checklists provide a roadmap for accomplishing project goals and are used <br />by all key personnel, including the City of Sunny Isles Beach's project representative. <br />OgRFQ 20-07-01 <br />ContinuinProfessional Consulting Services (CCNA) RA I <br />A•artFcr+ <br />Erreyurc <br />— <br />0.eP0•fM0. 11 <br />._.._- <br />L <br />Sitc Visits <br />• eve opment o c ec fists ase on those <br />OEK FIXiMUt/SNA\PAUF•EMFMARY _ <br />requirements <br />enI <br />_ <br />• Preparation of a schedule for phase submittals, <br />including anticipated deliverables at each <br />milestone orr <br />• Preparation of project specific drawing list, <br />specification requirements and checklist <br />Preparation of project specific construction a <br />administration checklist <br />Roadmap /Project Plan <br />These procedures and their respective checklists provide a roadmap for accomplishing project goals and are used <br />by all key personnel, including the City of Sunny Isles Beach's project representative. <br />OgRFQ 20-07-01 <br />ContinuinProfessional Consulting Services (CCNA) RA I <br />
The URL can be used to link to this page
Your browser does not support the video tag.