My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rodriguez Architects, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Rodriguez Architects, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:13:12 AM
Creation date
8/21/2020 11:12:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Superintendent of Schools <br />Alberto M. Carvalho <br />December 17, 2014 <br />Lourdes Rodriguez <br />2121 Ponce de Leon Blvd. Suite 1010 <br />Coral Gables, Florida 33134 <br />Dear Ms. Rodriguez, <br />Miand•Dade County School Bear/ <br />Pella Tabares Hantrnan, Chair <br />Dr. Lawrence S. Feldman, Vice Chair <br />Dr. Dorothy Bendross-Mindingall <br />Susie V. Castillo <br />Carlos L. Curbelo <br />Dr. Wilbed "Tee" Holloway <br />Dc Marlin Karp <br />Dc Marta Perez <br />Raquel A. Regalado <br />in my years as an administrator I have had several opportunities to interact with architects, contractors, <br />and construction workers through school -related projects. Never, however, has the process been as <br />smooth as it was under the direction of your firm, Rodriguez Architects, Inc. I found our biweekly <br />meetings organized by a checklist that outlined the entire scope of work with timelines and weekly <br />expectations. As a result, I always felt completely aware of what was happening in our school. <br />Additionally, the personnel with whom I worked were pleasant and professional. They answered all my <br />questions and checked in with me daily to ensure a smooth school day. When I expressed concern <br />about the building being without air conditioning, an important part of cleaning during the summer, the <br />team followed through to make sure air conditioning was available to pivotal areas and ultimately, <br />throughout the school according to the delivery date. <br />Your firm's organization and subsequent follow-up alleviated much of the concern associated with <br />construction for an administrator. Please accept this letter as a thank you for your outstanding service <br />and as a recommendation for your services in the future. <br />Sincerely, <br />Dawn M. Baglos <br />Principal <br />Dr. Michael M. Krop Senior High School • 1410 Cotrrltyline Road •Miami, FL 33179 •Dawn M. Baglos, Principal <br />305-652-6808. 305-G51-8043 (FAX) • mkhs.dadeschools.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.