Laserfiche WebLink
General Planning <br />Redevelopment Srvcs <br />Arch Visualizations & 3D <br />Water / Wastewater Eng <br />Electrical Engineering <br />Environmental Srvcs <br />Website Development <br />GIS Mapping & Analysis <br />Surveying and Mapping <br />Urban Design Traffic Engineering Constr Admin / CEI <br />Landscape Architecture Civil Engineering Public Outreach <br />20. EXAMPLE PROJECT <br /> KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />22. YEAR COMPLETED <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />a. <br />b. <br />c. <br />d. <br />e. <br />STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS <br />In-house CGA services provided for this project: <br />2014 2018 <br />14 <br />CITY OF FORT LAUDeRDALe <br />Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and <br />all in-house services identified above. <br />Mills Pond Park <br />enrique Sanchez 954.123.4567 <br />Fort Lauderdale, FL <br />Assistant Parks & Recreation Director ESanchez@forlauderdale.gov <br />APPROXIMATE PROJECT SIZE: <br />PROFESSIONAL FEES: <br />CONSTRUCTION COST: <br />7 Acres <br />$ 461,560 <br />$ 3,700,000 <br />Calvin, Giordano & Associates, Inc. was selected by the City of Fort Lauderdale to <br />provide planning, design, and construction services for the addition of three new <br />soccer and lacrosse fields at Mills Pond Park. The existing park located at 2201 N.W. <br />9th Avenue (Powerline Road) has three lighted soccer fields, one un-lighted soccer <br />field, and five lighted softball fields. The improvements to the park include three new <br />fields and all associated sports lighting, drainage, and irrigation, as well as a future <br />restroom/concession building, new parking, walkways, and landscaping. Originally, <br />the city staff and the park’s stakeholders had indicated their desire to have at least <br />2 of the 3 fields be synthetic turf, and to use organic in-fill material instead of black <br />rubber in-fill material for them. <br />Working with the City and stakeholders, CGA prepared six (6) configuration options <br />for bidding purposes per the City’s desire to see what layout would fit within their <br />construction budget. The City ended up choosing the option with three (3) artificial <br />turf fields and a future restroom. In addition, the City of Fort Lauderdale wanted to <br />continue their emphasis on Sustainability by incorporating Green Design principles <br />such as LED sports lighting, innovative drainage solutions, permeable pavers, and <br />Florida Friendly Landscaping. One of the main reasons that CGA was selected for <br />this project is its excellent team of sub-consultants. <br />The team consisted of Sports Turf One for sports field expertise, Lakdas/Yohalem <br />Engineering for structural engineering, and Nutting Engineering of Florida for <br />geotechnical. Construction of the project began in January 2017 and completed in <br />February 2018. <br />X X <br />X <br />X <br />X <br />119