<br />19. RELEVANT PROJECTS (CONT.)
<br />p.
<br />o.
<br />n.
<br />q.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS
<br />lift Station No. 52 Rehabilitation
<br />Cooper City, Florida
<br />Project Manager for a municipal sewer pump station rehabilitation project. Improvements were needed due to the expiring service life
<br />of the pumps and their insufficient operating capacity during peak flows and significant rain events. Tasks included design, permitting,
<br />interpreting pressure data logger readings, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis,
<br />monitoring geotechnical work, and coordinating with other professional disciplines.
<br />2015 - 2016 2016
<br />lift Station No. 21 Replacement
<br />Cooper City, Florida
<br />Project Manager for a municipal sewer pump station replacement project. The station is located within an HOA and required mechanical,
<br />aesthetic, and immediate odor control improvements. Due to its proximity with adjacent residences and frequent odor complaints, the
<br />station was relocated across the street. This required a sewer conveyance, landscape, and irrigation redesign. Tasks included design,
<br />permitting, setting up pressure data loggers, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis,
<br />preparing technical specifications, permitting, shop drawing reviews, addressing Contractor RFI’s, conducting routine inspections, and
<br />final project certification.
<br />2015 - 2018 2017 - 2018
<br />Bid Pack 8 infrastructure improvements
<br />Oakland Park, Florida
<br />Project Engineer for the water and sewer improvements project. Design included approximately 18,000 linear feet of water main
<br />replacement, 800 linear feet of drainage with exfiltration trench, 2,500 linear feet of sidewalk, rehabilitation of a sewer pump station, and
<br />installation of four sewer combination air valves (SCAV) on the existing force main network. The system upgrades consisted of replacing
<br />two-inch and four-inch diameter water main with either six-inch or eight-inch PVC or DIP. Additional fire hydrants were designed to
<br />provide adequate fire protection for the residential neighborhoods. In addition to these water main improvements and SCAV’s, the sewer
<br />pump station improvements were a critical component of this project. The station was experiencing failure due to extended run times
<br />because of increases in collected wastewater flows and discharge force main pressures. Electrical upgrades and the design of variable
<br />frequency drives were required to handle the various flow conditions.
<br />2014 - 2018 2018 - 2019
<br />lloyd estates industrial and Residential improvements
<br />Oakland Park, Florida
<br />Project Engineer for the design and modification of a stormwater conveyance system to improve flooding within the Lloyd Estates
<br />Neighborhood. The project included a stormwater pump station and floodgates for major storm events along with new stormwater
<br />structures and exfiltration trenches. New seawalls were designed and constructed downstream of the station that ultimately discharged
<br />to the ocean via the South Florida Water Management District (SFWMD) C-13 Canal. The pump station site provided means for erosion
<br />control that included rip-rap design. CGA also coordinated and assessed the environmental impacts with SFWMD and the Army Corps of
<br />Engineers. In addition to stormwater discharge improvements, several areas included upgrades to the water distribution system for fire
<br />protection services. The project funding was driven by a FEMA grant.
<br />2013 - 2017 2016 - 2017
<br />Bid Pack 9 infrastructure improvements
<br />Oakland Park, Florida
<br />Project Engineer during the construction phase of a large scale infrastructure improvements project that included replacement of three
<br />municipal lift stations, approximately 20,000 linear feet of water main, 5,600 linear feet of force main, over 200 catch basins, and
<br />numerous exfiltration trenches and conveyance piping throughout the 500 acre project area. Responsibilities included shop drawing
<br />reviews, attending progress meetings, general engineering during construction, reviewing as-builts, validating and negotiating change
<br />orders, and coordinating final project certifications.
<br />2011 - 2017 2015 - 2017
<br />44
|