|
c.
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete One Section E for Each Key Person.)
<br />12. NAME
<br />16. EDUCATION (Degree and Specialization)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />15. FIRM NAME AND LOCATION (City and State)
<br />13. ROLE IN THIS CONTRACT
<br />a. TOTAL b. WITH CURRENT FIRM
<br />14. YEARS OF EXPERIENCE
<br />19. RELEVANT PROJECTS
<br />a.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />(1) TITLE AND LOCATION (City and State)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />(2) YEAR COMPLETED
<br />Check if project performed with current firmX
<br />STANDARD FORM 330 (REV. 8/2016) - SF330 SANDRA Lee
<br />SANDRA LEE, AICP CEP, CFM, LEED AP BD
<br />Calvin, Giordano & Associates, Inc.
<br />M.A. Biology/ecology, Magna Cum Laude AICP CeP
<br />B.A. Biology/Botany, Manga Cum Laude LeeD AP BD+C / CFM US-07579
<br />Fort Lauderdale, FL
<br />St. Cloud State University, St. Cloud, MN No. 018627
<br />St. Cloud State University, St. Cloud, MN No. 10215598
<br />Ms. Lee has over 30 years of professional experience & heads up CGA’s Env. Dept. coordinating regulatory permitting, env. planning, site
<br />assessment, resource management & env. technical support services. In general, Ms. Lee provides permitting services for env. resources
<br />permits at the local, state & federal level, coordinates interagency & multi-disciplinary team efforts, provides the most feasible dev. & mitigation
<br />options, probable costs for mitigation options, provides tree mitigation plans & tree removal permitting services, conducts wetland delineations
<br />& wetland functional assessments, prepares Coastal & Conservation Elements for Comprehensive plans, coordinates on Comprehensive Plan
<br />Evaluation & Appraisal Reports (EAR) & EAR based amendments, designs wetland mitigation areas, provides bidding & const. oversight
<br />services for the const. & installation of mitigation areas, provides technical support, provides env. resource management & environmental
<br />planning services to municipalities, provides floodplain management assistance & annual CRS reporting, provides annual NPDES reporting,
<br />manages field staff conducting wildlife & habitat assessments, imperiled species surveys & compliance monitoring reporting.
<br />ENVIRONMENTAL SPECIALIST 30+20
<br />City Center Parking
<br />Pembroke Pines, Florida
<br />Responsible for environmental permitting, including the site assessments, wetland assessments and obtaining a US COE, a County and
<br />a South Florida Water Management District permit for the development site and for a newly constructed off-site mitigation area. Nearly
<br />the entirety of the development site was wetland and was comprised of multiple habitat types and qualities; also developed the mitigation
<br />plan for the conversion of an offsite golf course to wetland habitats. The development fell within an FPL power line easement requiring
<br />additional coordination and approvals with FPL. The US COE permit required purchasing mitigation bank credits. Economic developments
<br />in 2014 lead to the City selling the off-site golf course. Worked with the City to release the recorded conservation easement and obtain
<br />new permits to allow the City to build the parking facility within the FPL easement with a combination of mitigation bank credits and off-
<br />site mitigation at another location.
<br />2008 2012
<br />Lloyd estates Residential Improvements
<br />Oakland Park, Florida
<br />CGA was retained by the City of Oakland Park to address flooding issues in an older residential neighborhood. The project involves the
<br />installation of swales/exfiltration trenches, piping and other improvements within the upland public right of ways. The project also involves
<br />the installation of two (2) new outfalls into the Sleepy River; dredging, a new sluice gate and new seawalls in the river; the construction of
<br />a pump station and the creation of a bio-swale/river overflow area within property adjacent to the river. CGA environmental staff conducted
<br />all site assessments for permitting, designed the bio-swale stormwater overflow area, and processed permits through the U.S. COE, the
<br />SFWMD and Broward County. Permitting challenges with this project included close coordination with the SFWMD operations staff on
<br />project interactions with the C13 canal, also amending a sovereign submerged lands lease for newdredge areas. CGA’s fees: $520,000.
<br />2013 Ongoing
<br />Drainage Improvements
<br />Weston, Florida
<br />Conducted the site inspections and obtained permits from the US COE, the County and SFWMD for drainage enhancements.
<br />2012 2016
<br />61
|