Laserfiche WebLink
h. <br />19. RELEVANT PROJECTS (CONT.) <br />f. <br />e. <br />d. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />Check if project performed with current firmX <br />STANDARD FORM 330 (REV. 8/2016) - SF330 DOMiNic MAck <br />Sunny isles Beach Pedestrian Overpass Study <br />Sunny Isles Beach, Florida <br />Contributing Designer: Developed a preliminary design of conceptual site plan and 3-dimensional modeling. Prepared visual presentations <br />for conceptual strategies for visioning the pedestrian overpass. Technical tasks include: preparation of site plan drawings and 3-dimensional <br />modeling and rendering visualizations. <br />2018 <br />North Bay Road Pedestrian Bridge <br />Sunny Isles Beach, Florida <br />Contributing Designer: Performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction <br />document detailing. <br />2018 2016 - 2018 <br />90th and 91st Streetscape Study <br />Cooper City, Florida <br />Contributing Designer: Performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction <br />document detailing. <br />2017 N/A <br />key Biscayne civic Park <br />Key Biscayne, Florida <br />Contributing Designer: Developed a preliminary design of conceptual site plan for a promenade focused on enhancing pedestrians’ <br />experiences through ample sidewalks, furnishings, plazas and water features. Performed technical tasks including the preparation of <br />site plan rendering, Sections and furnishing selections. Designed and developed fabrication strategies on key sculptural components, <br />including parametric 3-dimensional modeling. <br />Ongoing <br />81