My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gallagher Bassett Services, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Gallagher Bassett Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:23:23 AM
Creation date
8/21/2020 11:22:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) PAGE 17 <br />RESPONSE TO REQUEST FOR QUALIFICATIONS FOR <br />Continuing Professional Consulting Engineering Services-Environmental Engineering <br />#BID 20-07-01 <br /> <br /> <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER: <br />9 <br />21. TITLE AND LOCATION (City and State) <br /> <br />Miami-Dade College, Hialeah Campus, Bldg. 4, Hialeah, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 N/A <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Miami-Dade College <br />b. POINT OF CONTACT NAME <br />Ms. Eneida Perez-Mendez <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-237-0576 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />GBTS executed a full interior/exterior/roof asbestos inspection prior to demolition activities planned for the Building 4. In addition, GBTS <br />performed Lead testing and cataloguing of hazardous materials to be removed prior to demolition. P ersonally coordinated proposal and <br />fieldwork efforts over a two-year period with MDC and GC. GBTS’s scope of work included: <br /> <br />• Inspection and bulk sampling of 250+ samples and prepare for lab analysis. <br />• Final report preparation geared towards eventual abatem ent activities. <br />• Coordination with MDC to obtain pricing for abatement and subsequent air testing. <br />• Inspection of each floor for lead paint and hazardous materials to be removed prior to demolition. <br />• Conducted Final air clearance testing for asbestos after ab atement on each affected floor; prepared final report for permit closeout. <br />• Conducted lead waste stream testing prior to demolition activities. <br /> <br />Cost: $16,000+ Size: Building 4 / 250+ Samples Project Director: Craig C. Clevenger, PG <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME <br />GBTS <br />(2) FIRM LOCATION (City and State) <br />Miami-Dade County, Miami Lakes, FL <br />(3) ROLE <br />Prime <br />
The URL can be used to link to this page
Your browser does not support the video tag.