My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gallagher Bassett Services, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Gallagher Bassett Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:23:23 AM
Creation date
8/21/2020 11:22:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESPONSE TO REQUEST FOR QUALIFICATIONS FOR <br />Continuing Professional Consulting Engineering Services-Environmental Engineering <br />#BID 20-07-01 <br /> <br />2 <br /> <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Artificial Reef Monitoring, Miami, Florida <br /> <br /> <br /> <br /> <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Conducted scientific diving for the post construction monitoring of artificial reefs associated with the Miami Harbor <br />Phase III Federal Channel Expansion Project in accordance with permit compliance. Assist in producing <br />deliverables for client including year three monitoring report. <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Everglades Safari Park, Miami, Florida <br /> <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Environmental permitting and engineering design of 3-acre park improvements to adapt to water level rise. Design <br />elements include ticket gazebo, waiting area, floating docks, fuel systems, potable water system, parking lot <br />improvements, drainage restoration and pedestrian access bridge. Conducted wetland delineation to facilitate <br />FDEP Environmental Resource Permit, Corps permit, and SFWMD permit. <br />f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> First Presbyterian Church, Miami, Florida <br /> <br /> <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 Present <br />O <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Shoreline stabilization design and environmental permitting of 220 feet of seawall, bulkhead and baywalk. Secured <br />final permits from Miami-Dade, the FDEP, and Corps. Conducted marine resource survey. <br /> <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Hillsboro Inlet Management, Broward County, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Present N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Continuing consultation services with District regarding inlet management activities including annual bypass <br />reporting, permitting of jetty improvements, marine resource mapping, coral relocation, and compliance <br />assistance. <br /> <br />H. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Martin County Artificial Reef Monitoring, Martin County, <br />Florida <br /> <br /> <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Year one and two biological monitoring of marine resource surveys for five artificial reefs located within Martin <br />County. Conducted fish abundance surveys between 55–90 feet deep, identified all marine resources present, <br />developed Field Observation Report, planned numerous consecutive deep dives, determined durability and <br />stability of the reef, and provided deliverables to client in a timely manner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.