|
STANDARD FORM 330 (REV. 8/2016)
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Francois Thomas, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Principal Engineer, Special Inspector
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />27
<br />b. WITH CURRENT FIRM
<br />18 15. FIRM NAME AND LOCATION (City and State)
<br />TSF, West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) MS in Geotechnical Engineering, 1993; BS in Civil Engineering, 1991 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 56381 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Special Inspector 7021399, Certified Masonry Inspector, Radiation Safety Officer 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Gateway Park Pedestrian Bridge,
<br />City of Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. Completed on time Within budget
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Samson Oceanfront Park,
<br />City of Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Auger-Cast Pile Inspection and Construction Material Testing Services for the Samson Oceanfront Park located in the City of Sunny Isles Beach, Florida. The project consists of a compact beach park with a playground, pavilion and showers. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary.
<br />Completed on time Within budget
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Don Soffer School Flashing Signal,
<br />City of Aventura, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />On-Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas is the Principal Engineer of the QC Services for the Don Soffer School – Flashing Signals located in the City of Aventura, Florida. The project consists of the installation of drilled shafts along NE 213th Street intersection with NE 3100 Block and NE 3200 Block. TSF services include laboratory testing, and concrete sampling/testing, and reporting. A TSF QC Manager is providing review of daily reports, project coordination and attending meetings as necessary. The project is currently on-going.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />N. Miami Avenue Bridge Replacement,
<br />Miami-Dade County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the QC Services for the N. Miami Avenue Bridge Replacement, located in Miami-Dade County, Florida. Provided a QC Plan and TSF maintained a Density Logbook on-site. A TSF QC Manager provided review of daily reports, project coordination and attended meetings as necessary. Completed on time Within budget
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Vista Verde Phase 4, Roadway and Drainage Improvement,
<br />City of Miami Gardens, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time Within budget
<br />36
|