Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br /> Lakdas Nanayakkara, PE <br />13. ROLE IN THIS CONTRACT <br /> Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 40 <br />b. WITH CURRENT FIRM <br /> 37 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Lakdas/Yohalem Engineering, Inc., Fort Lauderdale, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Post graduate diploma in Structural Engineering <br />B.S. Honors Degree in Civil Engineering with Structural <br />Engineering Major <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida Engineer PE#037590 / Certified Structural Masonry Inspector <br />Certified Uniform Building Code Inspector / Certified General Contractor <br />Certified Threshold Inspector <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Structural Engineering Expert for Unsafe Structure Board – City of Margate: 2001 - Present <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Miramar Water Treatment Plant Expansion <br />Miramar, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Services included structural site condition survey, structural analysis, design, construction phase services and special inspections <br />services for renovations and upgrades. Const. Cost: $500K Role: EOR <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Young Circle Amphitheater <br />Hollywood, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> 2009 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />New Amphitheater venue, located at Young Circle which included the design of structural system housing the new amphitheater, as <br />well as, threshold inspections. Const. Cost: $3M Role: EOR <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />West Wind Community Park <br />City of Lauderhill, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Structural renovation and hurricane hardiness for the Park Community Center renovation and addition. Services included threshold <br />inspection services. Const. Cost: $4M Role: EOR <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Hallandale High School Re-Roofing <br />Hallandale Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Condition survey, structural analysis, structural design and roof design. Const. Cost: $100K Role: EOR <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />McNab Bridge <br />Pompano Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2003 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Condition Survey, restoration and expansion of a 5 span, 4 lane bridge. Girder bridge with continuous cast in place and pre-stressed <br />concrete pile foundation. Const. Cost: $1.2M Role: EOR <br />Page 24